AIRLINK 217.98 Decreased By ▼ -4.91 (-2.2%)
BOP 10.93 Increased By ▲ 0.11 (1.02%)
CNERGY 7.55 Decreased By ▼ -0.01 (-0.13%)
FCCL 34.83 Decreased By ▼ -2.24 (-6.04%)
FFL 19.32 Increased By ▲ 0.08 (0.42%)
FLYNG 25.15 Decreased By ▼ -1.89 (-6.99%)
HUBC 131.09 Decreased By ▼ -1.55 (-1.17%)
HUMNL 14.56 Decreased By ▼ -0.17 (-1.15%)
KEL 5.18 Decreased By ▼ -0.22 (-4.07%)
KOSM 7.36 Decreased By ▼ -0.12 (-1.6%)
MLCF 45.63 Decreased By ▼ -2.55 (-5.29%)
OGDC 222.08 Decreased By ▼ -1.18 (-0.53%)
PACE 8.16 Decreased By ▼ -0.02 (-0.24%)
PAEL 44.19 Increased By ▲ 0.69 (1.59%)
PIAHCLA 17.69 Decreased By ▼ -0.37 (-2.05%)
PIBTL 8.97 Decreased By ▼ -0.10 (-1.1%)
POWERPS 12.51 Decreased By ▼ -0.50 (-3.84%)
PPL 193.01 Decreased By ▼ -5.23 (-2.64%)
PRL 43.17 Increased By ▲ 0.93 (2.2%)
PTC 26.63 Decreased By ▼ -0.76 (-2.77%)
SEARL 107.08 Decreased By ▼ -3.00 (-2.73%)
SILK 1.04 Decreased By ▼ -0.02 (-1.89%)
SSGC 45.00 Decreased By ▼ -2.30 (-4.86%)
SYM 21.19 Increased By ▲ 0.42 (2.02%)
TELE 10.15 Decreased By ▼ -0.37 (-3.52%)
TPLP 14.51 Decreased By ▼ -0.44 (-2.94%)
TRG 67.28 Decreased By ▼ -1.57 (-2.28%)
WAVESAPP 11.29 Decreased By ▼ -0.63 (-5.29%)
WTL 1.70 Decreased By ▼ -0.09 (-5.03%)
YOUW 4.25 Decreased By ▼ -0.10 (-2.3%)
BR100 12,397 Increased By 33.3 (0.27%)
BR30 37,347 Decreased By -871.2 (-2.28%)
KSE100 117,587 Increased By 467.3 (0.4%)
KSE30 37,065 Increased By 128 (0.35%)

Railway Engineering Department Mirpurkhas has completed the work of converting a kilometre- long meter gauge railway track into broad gauge railway track from Khokhrapar railway station towards Zero Point borderline after shifting the programme of start of work from Mirpurkhas to Khokhrapar. Reliable sources of Railway Department informed APP here on Thursday that Railway Minister, Chairman Railway and relevant railway personnel would arrive here on May 9. The Railway minister would inaugurate the work near Mirpurkhas railway station and in this connection, arrangements were being finalised here, they added.
It may be recalled that after issuance of directives by the federal government and allocation of funds, the Railway Engineering Department had decided to start the work from railway station Mirpurkhas upto Khokhrapar.
For this purpose, about 8000 sleepers and other iron materials had arrived here through a special goods train and work was started from here, the sources revealed.
However, in the initial stage the Engineering Department revised its strategy and shifted most of the materials to Khokhrapar railway station after deciding that work would be started firstly from Khokhrapar railway station towards Zero Point border line, a distance of about 8 kilometres from Khokhrapar railway station.
The sources said that with the help of about 200 railway labourers gathered from different railway stations of Sindh by the railway authority, work was launched from Khokhrapar railway station towards the Zero Point. Work till one kilometre had so far been completed after day-night work.

Copyright Associated Press of Pakistan, 2005

Comments

Comments are closed.