AIRLINK 209.55 Decreased By ▼ -1.42 (-0.67%)
BOP 10.46 Decreased By ▼ -0.21 (-1.97%)
CNERGY 7.35 Decreased By ▼ -0.06 (-0.81%)
FCCL 34.39 Increased By ▲ 0.82 (2.44%)
FFL 18.05 Decreased By ▼ -0.36 (-1.96%)
FLYNG 22.92 Decreased By ▼ -0.70 (-2.96%)
HUBC 132.49 Increased By ▲ 1.10 (0.84%)
HUMNL 14.14 Increased By ▲ 0.04 (0.28%)
KEL 5.03 Increased By ▲ 0.05 (1%)
KOSM 7.07 Decreased By ▼ -0.09 (-1.26%)
MLCF 45.20 Increased By ▲ 1.44 (3.29%)
OGDC 218.38 Increased By ▲ 4.82 (2.26%)
PACE 7.58 Increased By ▲ 0.13 (1.74%)
PAEL 41.70 Increased By ▲ 0.17 (0.41%)
PIAHCLA 17.30 Decreased By ▼ -0.17 (-0.97%)
PIBTL 8.55 Decreased By ▼ -0.05 (-0.58%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 189.03 Decreased By ▼ -0.57 (-0.3%)
PRL 42.33 Decreased By ▼ -1.98 (-4.47%)
PTC 25.17 Increased By ▲ 0.20 (0.8%)
SEARL 103.96 Increased By ▲ 0.59 (0.57%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 39.24 Decreased By ▼ -1.26 (-3.11%)
SYM 19.16 Decreased By ▼ -0.36 (-1.84%)
TELE 9.24 Decreased By ▼ -0.20 (-2.12%)
TPLP 13.10 Decreased By ▼ -0.40 (-2.96%)
TRG 69.18 Increased By ▲ 4.71 (7.31%)
WAVESAPP 10.72 Decreased By ▼ -0.18 (-1.65%)
WTL 1.71 Increased By ▲ 0.06 (3.64%)
YOUW 4.14 Decreased By ▼ -0.07 (-1.66%)
BR100 12,079 Decreased By -111.6 (-0.92%)
BR30 36,602 Increased By 19.8 (0.05%)
KSE100 116,053 Decreased By -202.4 (-0.17%)
KSE30 36,578 Decreased By -25.8 (-0.07%)

Interior Minister Aftab Ahmed Khan Sherpao will inaugurate 7.60-km long Park Road on Monday. An official of Capital Development Authority (CDA) told this scribe on Saturday that construction of 24 feet wide dual carriageway has been built at a cost of Rs 262.468 million. The dual carriageway starts from Rawal Dam Chowk, connecting Lehtrar road and other surrounding villages. Sources said that later on it would be declared a VVIP route after extension of the road under which CDA has already planned to construct dual expressway from Lehtrar to Islamabad International Airport aiming at to ensure safe movements of VVIPs or heads of states.
Senior official said the project started in May 2004 and Frontier Works Organisation (FWO) completed it within the stipulated time frame.

Copyright Business Recorder, 2005

Comments

Comments are closed.