AGL 37.85 Decreased By ▼ -0.30 (-0.79%)
AIRLINK 129.10 Increased By ▲ 4.03 (3.22%)
BOP 7.31 Increased By ▲ 0.46 (6.72%)
CNERGY 4.63 Increased By ▲ 0.18 (4.04%)
DCL 8.40 Increased By ▲ 0.49 (6.19%)
DFML 38.60 Increased By ▲ 1.26 (3.37%)
DGKC 81.01 Increased By ▲ 3.24 (4.17%)
FCCL 32.56 Increased By ▲ 1.98 (6.47%)
FFBL 74.39 Increased By ▲ 5.53 (8.03%)
FFL 12.30 Increased By ▲ 0.44 (3.71%)
HUBC 109.21 Increased By ▲ 4.71 (4.51%)
HUMNL 13.95 Increased By ▲ 0.46 (3.41%)
KEL 5.08 Increased By ▲ 0.43 (9.25%)
KOSM 7.47 Increased By ▲ 0.30 (4.18%)
MLCF 38.25 Increased By ▲ 1.81 (4.97%)
NBP 70.95 Increased By ▲ 5.03 (7.63%)
OGDC 187.75 Increased By ▲ 8.22 (4.58%)
PAEL 25.21 Increased By ▲ 0.78 (3.19%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 151.50 Increased By ▲ 7.80 (5.43%)
PRL 25.25 Increased By ▲ 0.93 (3.82%)
PTC 17.15 Increased By ▲ 0.75 (4.57%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.50 Increased By ▲ 0.28 (3.88%)
TOMCL 32.95 Increased By ▲ 0.98 (3.07%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.50 Increased By ▲ 0.37 (2.29%)
TRG 56.55 Increased By ▲ 1.89 (3.46%)
UNITY 27.85 Increased By ▲ 0.35 (1.27%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,541 Increased By 451.6 (4.48%)
BR30 30,970 Increased By 1461.1 (4.95%)
KSE100 98,294 Increased By 3719.5 (3.93%)
KSE30 30,669 Increased By 1224.1 (4.16%)

The development work is briskly underway on converting of 37 kilometre long Sialkot-Wazirabad road into dual carriageway costing Rs 880 million and the project would be completed in a stipulated period of one year. Official sources told Business Recorder here on Thursday that the completion of this mega project would not only improve the flow of traffic but also ensure the speedy handling of exportable consignments from Sialkot Dry Port (SPD).
Besides, it would also play an instrumental role in bringing big boom in exports because Sialkot Export Processing Zone (SEPZ) and Sialkot International Airport are located on this track.
Meanwhile, the local business community especially the exporters have expressed their satisfaction and thanked the Punjab chief minister for initiating the dual-way project of Sialkot-Wazirabad road.

Copyright Business Recorder, 2005

Comments

Comments are closed.