AIRLINK 191.00 Decreased By ▼ -5.65 (-2.87%)
BOP 10.15 Increased By ▲ 0.01 (0.1%)
CNERGY 6.75 Increased By ▲ 0.06 (0.9%)
FCCL 34.35 Increased By ▲ 1.33 (4.03%)
FFL 17.42 Increased By ▲ 0.77 (4.62%)
FLYNG 23.80 Increased By ▲ 1.35 (6.01%)
HUBC 126.30 Decreased By ▼ -0.99 (-0.78%)
HUMNL 13.80 Decreased By ▼ -0.10 (-0.72%)
KEL 4.75 Decreased By ▼ -0.01 (-0.21%)
KOSM 6.55 Increased By ▲ 0.18 (2.83%)
MLCF 43.35 Increased By ▲ 1.13 (2.68%)
OGDC 226.45 Increased By ▲ 13.42 (6.3%)
PACE 7.35 Increased By ▲ 0.34 (4.85%)
PAEL 41.96 Increased By ▲ 1.09 (2.67%)
PIAHCLA 17.24 Increased By ▲ 0.42 (2.5%)
PIBTL 8.45 Increased By ▲ 0.16 (1.93%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 194.30 Increased By ▲ 10.73 (5.85%)
PRL 37.50 Decreased By ▼ -0.77 (-2.01%)
PTC 24.05 Decreased By ▼ -0.02 (-0.08%)
SEARL 94.97 Decreased By ▼ -0.14 (-0.15%)
SILK 1.00 No Change ▼ 0.00 (0%)
SSGC 40.00 Decreased By ▼ -0.31 (-0.77%)
SYM 17.80 Decreased By ▼ -0.41 (-2.25%)
TELE 8.72 Decreased By ▼ -0.01 (-0.11%)
TPLP 12.46 Increased By ▲ 0.25 (2.05%)
TRG 62.74 Decreased By ▼ -1.62 (-2.52%)
WAVESAPP 10.35 Decreased By ▼ -0.09 (-0.86%)
WTL 1.73 Decreased By ▼ -0.06 (-3.35%)
YOUW 4.02 Increased By ▲ 0.02 (0.5%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

Water and Power Development Authority (Wapda) has announced to extend incentive package for industries under which reconnection of industrial connection will be allowed after payment of 50 percent of the defaulting amount. A spokesman of Wapda said here on Monday that the Authority has modified clause-8 of the incentive package for industries.
Under this modification, industries have been allowed to re-avail of the package after payment of 50pc of the defaulting amount as a first instalment for reconnection whereas the remaining 50pc amount will be recovered in three instalments.
However, billing will be made after every fortnight to avoid accumulation of bills on the current consumption following reconnection till the total outstanding dues are cleared. "If any industrial unit defaults in payment of the current monthly bill or instalment, the connection of that unit will be disconnected without giving any notice required under normal practice," he said, adding, "the said incentive package can be availed up to December 31, 2005."

Copyright Business Recorder, 2005

Comments

Comments are closed.