AGL 36.51 Decreased By ▼ -1.49 (-3.92%)
AIRLINK 216.01 Increased By ▲ 2.10 (0.98%)
BOP 9.46 Increased By ▲ 0.04 (0.42%)
CNERGY 6.59 Increased By ▲ 0.30 (4.77%)
DCL 8.50 Decreased By ▼ -0.27 (-3.08%)
DFML 40.90 Decreased By ▼ -1.31 (-3.1%)
DGKC 99.48 Increased By ▲ 5.36 (5.69%)
FCCL 36.48 Increased By ▲ 1.29 (3.67%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 17.17 Increased By ▲ 0.78 (4.76%)
HUBC 126.25 Decreased By ▼ -0.65 (-0.51%)
HUMNL 13.35 Decreased By ▼ -0.02 (-0.15%)
KEL 5.24 Decreased By ▼ -0.07 (-1.32%)
KOSM 6.71 Decreased By ▼ -0.23 (-3.31%)
MLCF 44.24 Increased By ▲ 1.26 (2.93%)
NBP 60.50 Increased By ▲ 1.65 (2.8%)
OGDC 222.49 Increased By ▲ 3.07 (1.4%)
PAEL 40.60 Increased By ▲ 1.44 (3.68%)
PIBTL 8.16 Decreased By ▼ -0.02 (-0.24%)
PPL 191.99 Increased By ▲ 0.33 (0.17%)
PRL 38.60 Increased By ▲ 0.68 (1.79%)
PTC 27.00 Increased By ▲ 0.66 (2.51%)
SEARL 103.50 Decreased By ▼ -0.50 (-0.48%)
TELE 8.62 Increased By ▲ 0.23 (2.74%)
TOMCL 34.86 Increased By ▲ 0.11 (0.32%)
TPLP 13.60 Increased By ▲ 0.72 (5.59%)
TREET 24.99 Decreased By ▼ -0.35 (-1.38%)
TRG 71.99 Increased By ▲ 1.54 (2.19%)
UNITY 33.33 Decreased By ▼ -0.06 (-0.18%)
WTL 1.72 No Change ▼ 0.00 (0%)
BR100 11,987 Increased By 93.1 (0.78%)
BR30 37,178 Increased By 323.2 (0.88%)
KSE100 111,351 Increased By 927.9 (0.84%)
KSE30 35,039 Increased By 261 (0.75%)

Provincial Advisor on Children Rights Dr Faiza Asghar has said in order to provide educational and recreational facility under one roof on the direction of Punjab Chief Minister, the implementation on project of construction of special children's block has been kicked off.
The block would be completed at a cost of Rs 5.66 million at the Children Library Complex (CLC). Speaking at a function held in connection with groundbreaking ceremony of the block here on Thursday, Dr Faiza Asghar said that provision of improved and equal educational opportunities to the special children was their basic right which the government would take every possible step.
Briefing to the Advisor, Project Director Library Rubina Tariq Jillani disclosed that construction of that 31,900 sq ft special children block would be completed till February 2006. She said the block would be equipped with latest facilities comprising elevator, speech therapy, Braille library, soft playroom, computer lab, arts and craft center, theater and film room, music room and crush area etc. Later, the advisor inspected different sections of the library.

Copyright Business Recorder, 2005

Comments

Comments are closed.