AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 Increased By 59.3 (0.57%)
BR30 31,226 Increased By 36.9 (0.12%)
KSE100 98,080 Increased By 281.6 (0.29%)
KSE30 30,559 Increased By 78 (0.26%)

Advisor to Chief Minister Mumtaz Hameed has directed the removal of garbage dump and debris lying on the road linking Garden with Manghopir Road within 24 hours. He issued the directive to District Officer Mahmood Baluch during a visit to under-construction Garden-Manghopir Road on Friday.
He noted that as a result of garbage dump and debris, the people living in the area were facing problems in movement.
On the occasion DO informed the Advisor that construction of this 6.4 Km road was started in July 2005 at a cost of Rs 198.87 million. The road would have four to 10 feet wide footpath on both sides and two to eight feet wide central island.
He said a 15-inch dia pipeline would be laid for water drainage.
Regarding delay in the project, the Advisor was informed that KESC cables and water and sewerage lines were passing through the center of the road and their shifting was problematic.
Mumtaz Hameed asked the DO to hold a meeting of officials of concerned departments to take up this issue.
On complaint by project officers about parking issue in Pak Colony, the Advisor directed the Traffic Section Officer not to allow any kind of parking on roadsides.
He directed DO Mahmood Baluch that no fresh road be now dug up until existing under-construction road is completed. He issued instructions for maintaining quality of construction and material.

Copyright Associated Press of Pakistan, 2005

Comments

Comments are closed.