AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

The engineers of Pakistan Steel have successfully retrieved 6,000 tonnes of useable coke worth Rs 70 million by screening the abandoned heaps of industrial waste dumped in the premises of Pakistan Steel since many years, says a press release here on Monday.
The achievement is a result of strategy adopted by the management under the visionary and timely guidance of the Chairman, Pakistan Steel, Lieutenant General Abdul Qayyum (retd).
The Chairman, in recognition of the efforts a deputy manager in making the achievement possible, announced his promotion to the next higher grade.
The Chairman disclosed this while speaking an Iftar dinner hosted at Quaid-I-Azam Park, Steel Town, after inaugurating the newly-constructed "City Gate" of the park.
He recalled that owing to urgent repair and maintenance works of coke oven batteries (COBP), being carried out through internal resources for the last few months, the production of coke was slowed down.
Hence, to keep the "blast furnace" running, the retrieval strategy of coke was chalked out to amply supplement the shortage of coke resulting from slow production at the COBP.

Copyright Pakistan Press International, 2005

Comments

Comments are closed.