AGL 37.55 Increased By ▲ 0.05 (0.13%)
AIRLINK 218.49 Decreased By ▼ -4.40 (-1.97%)
BOP 10.68 Decreased By ▼ -0.14 (-1.29%)
CNERGY 7.32 Decreased By ▼ -0.24 (-3.17%)
DCL 9.10 Decreased By ▼ -0.32 (-3.4%)
DFML 40.35 Decreased By ▼ -0.61 (-1.49%)
DGKC 102.20 Decreased By ▼ -4.56 (-4.27%)
FCCL 34.40 Decreased By ▼ -2.67 (-7.2%)
FFL 19.50 Increased By ▲ 0.26 (1.35%)
HASCOL 12.82 Decreased By ▼ -0.36 (-2.73%)
HUBC 130.69 Decreased By ▼ -1.95 (-1.47%)
HUMNL 14.42 Decreased By ▼ -0.31 (-2.1%)
KEL 5.27 Decreased By ▼ -0.13 (-2.41%)
KOSM 7.20 Decreased By ▼ -0.28 (-3.74%)
MLCF 45.45 Decreased By ▼ -2.73 (-5.67%)
NBP 65.79 Decreased By ▼ -0.50 (-0.75%)
OGDC 220.12 Decreased By ▼ -3.14 (-1.41%)
PAEL 44.25 Increased By ▲ 0.75 (1.72%)
PIBTL 9.08 Increased By ▲ 0.01 (0.11%)
PPL 192.28 Decreased By ▼ -5.96 (-3.01%)
PRL 41.60 Decreased By ▼ -0.64 (-1.52%)
PTC 26.69 Decreased By ▼ -0.70 (-2.56%)
SEARL 107.29 Decreased By ▼ -2.79 (-2.53%)
TELE 10.32 Decreased By ▼ -0.20 (-1.9%)
TOMCL 35.86 Decreased By ▼ -0.76 (-2.08%)
TPLP 14.48 Decreased By ▼ -0.47 (-3.14%)
TREET 25.86 Decreased By ▼ -0.67 (-2.53%)
TRG 67.34 Decreased By ▼ -1.51 (-2.19%)
UNITY 33.50 Decreased By ▼ -0.69 (-2.02%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
BR100 12,291 Decreased By -72.5 (-0.59%)
BR30 37,354 Decreased By -863.8 (-2.26%)
KSE100 116,637 Decreased By -482.9 (-0.41%)
KSE30 36,770 Decreased By -166.8 (-0.45%)

imageLAHORE: Pakistan Water and Power Development Authority (WAPDA) Chairman Lt Gen (R) Muzammil Hussain on Monday urged the project management to put in their maximum to complete the 1410 MW-Tarbela 4th Extension Hydropower Project as early as possible.

During his visit to Tarbela 4th Extension Hydropower Project, he said that besides accelerating the pace of work, the stipulated quality standards must be adhered in letter and spirit for completion of the project. "Energy and water availability being most critical need will improve after completion of the projects underway," he asserted.

Discussion during the visit with the project authorities, consultants and contractors were aimed at tuning the timelines for completion of Tarbela 4th Extension Hydropower Project.

Tarbela Project was being constructed on tunnel No.4 of Tarbela Dam and it would increase generation capacity of Tarbela Hydel Power Station from 3478 MW to 4888 MW, after installation of three units with installed capacity of 470 MW each.

Earlier, WAPDA Chairman Lt Gen (R) Muzammil Hussain visited WAPDA Cadet College, Tarbela and viewed the facilities being provided to students with regard to curricular and co-curricular activities.

He also discussed with college administration the ways and means to improve those facilities for imparting quality education and building characters of the college students.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.