AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

World Bank has agreed to provide a soft loan of Rs4.7 billion to the provincial government for Jinnah Barrage Rehabilitation Project, situated in District Mianwali on Indus River.
"The Project would commence from 2007, as it would take one year for the completion of feasibility/design detail and hence would be completed in three years," the WB officials told PPI after having detailed meetings with the provincial authorities here on Monday.
The World Bank delegation comprising Usman Qamar, Paul Martin, Warren Water, Palmiery, Uzma Sadaf, Anwar Ali Bhatti, Shuaoughu, Willium Smith, Ghulam Ali and Waqar Zikria was headed by Xiaoki Li. They also met with P&D Chairman Sibrain Fazal Haleem and Secretary Irrigation Arif Nadeem.
According to details, the project envisages the rehabilitation, computerisation of barrage's manual gates, provision of subsidiary weir at a distance of about 800 ft downstream of the barrage weir to provide adequate water cushion for dissipation of energy through hydraulic jump and its downstream floor repair.

Copyright Pakistan Press International, 2005

Comments

Comments are closed.