AGL 40.02 Decreased By ▼ -0.01 (-0.02%)
AIRLINK 127.99 Increased By ▲ 0.29 (0.23%)
BOP 6.66 Increased By ▲ 0.05 (0.76%)
CNERGY 4.44 Decreased By ▼ -0.16 (-3.48%)
DCL 8.75 Decreased By ▼ -0.04 (-0.46%)
DFML 41.24 Decreased By ▼ -0.34 (-0.82%)
DGKC 86.18 Increased By ▲ 0.39 (0.45%)
FCCL 32.40 Decreased By ▼ -0.09 (-0.28%)
FFBL 64.89 Increased By ▲ 0.86 (1.34%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.51 Increased By ▲ 1.74 (1.57%)
HUMNL 14.75 Decreased By ▼ -0.32 (-2.12%)
KEL 5.08 Increased By ▲ 0.20 (4.1%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.44 Decreased By ▼ -0.08 (-0.2%)
NBP 61.00 Decreased By ▼ -0.05 (-0.08%)
OGDC 193.60 Decreased By ▼ -1.27 (-0.65%)
PAEL 26.88 Decreased By ▼ -0.63 (-2.29%)
PIBTL 7.31 Decreased By ▼ -0.50 (-6.4%)
PPL 152.25 Decreased By ▼ -0.28 (-0.18%)
PRL 26.20 Decreased By ▼ -0.38 (-1.43%)
PTC 16.11 Decreased By ▼ -0.15 (-0.92%)
SEARL 85.50 Increased By ▲ 1.36 (1.62%)
TELE 7.70 Decreased By ▼ -0.26 (-3.27%)
TOMCL 36.95 Increased By ▲ 0.35 (0.96%)
TPLP 8.77 Increased By ▲ 0.11 (1.27%)
TREET 16.80 Decreased By ▼ -0.86 (-4.87%)
TRG 62.20 Increased By ▲ 3.58 (6.11%)
UNITY 28.07 Increased By ▲ 1.21 (4.5%)
WTL 1.32 Decreased By ▼ -0.06 (-4.35%)
BR100 10,081 Increased By 80.6 (0.81%)
BR30 31,142 Increased By 139.8 (0.45%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

The development work on Sialkot international airport is in full swing and it is expected that cargo flights from this airport would be started by December this year, sources connected with the project told Business Recorder here on Saturday.
This project has a great significance because it is being totally financed by the private sector which so far had not built a project of this magnitude in the country.
The whole project would cost Rs 2 billion and it is being developed on ''build, own and operate'' (BOO) basis.
This modern and professionally designed international airport is spread over an area of 1004 acres and would be fully equipped to handle B747-400, A300 and 737 aircraft.
The airport will not only cater to the needs of ''golden industrial triangle'' of Sialkot, Gujranwala and Gujrat but would also generate thousands of employment opportunities besides bringing a revolutionary change in the socio-economic scenario of the region.
With the emergence of Dry Port, Export Processing Zone and this new Airport at Sialkot, the importance of the area will further enhance which will ultimately help in substantial increase in the exports from this area.
With the support and co-operation of the government the construction of airport has taken a practical shape which would solve the logistic problems of traders and industrialists of Sialkot, Gujranwala and Gujrat areas.
The potential traffic forecast for Sialkot international airport is scaled down at the time of opening to 530,339 passengers a year while estimated cargo tonnage at the time of opening is expected to be 28,515 tons. This means that by the end of 2012, about 53,000 tons cargo may be lifted from this Airport.
It was President General Pervez Musharraf who approved the project. The business community has played a significant role in undertaking this huge project.

Copyright Business Recorder, 2005

Comments

Comments are closed.