AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 No Change 0 (0%)
BR30 31,226 No Change 0 (0%)
KSE100 98,080 No Change 0 (0%)
KSE30 30,559 No Change 0 (0%)

The work on linking of Hubco with KESC link was completed on Tuesday evening, paving the way for commencement of electric supply directly from Hibco powerhouse to Karachi, it was learnt here Wednesday.
The work on this Rs 3 billion project was taken in hand in 2004 to meet power shortage in Karachi through additional supplies directly from Hubco, which has the generation capacity for 1200 MW.
So far, KESC had been receiving additional power supply of up to 600 MW from Wapda's Jamshoro-KDA Grid. However, the two circuits of Jamshoro Grid have since grown old and at times there had been tripping during maximum supply periods, causing power blackout in Karachi.
The link, according to sources, is planned to be inaugurated on May 15. Thereafter Karachi is supposed to receive additional 510 MW from Hubco, directly, besides supply from Wapda through Jamshoro Grid, already supplying 600 MW.

Copyright Associated Press of Pakistan, 2006

Comments

Comments are closed.