AIRLINK 209.55 Decreased By ▼ -1.42 (-0.67%)
BOP 10.46 Decreased By ▼ -0.21 (-1.97%)
CNERGY 7.35 Decreased By ▼ -0.06 (-0.81%)
FCCL 34.39 Increased By ▲ 0.82 (2.44%)
FFL 18.05 Decreased By ▼ -0.36 (-1.96%)
FLYNG 22.92 Decreased By ▼ -0.70 (-2.96%)
HUBC 132.49 Increased By ▲ 1.10 (0.84%)
HUMNL 14.14 Increased By ▲ 0.04 (0.28%)
KEL 5.03 Increased By ▲ 0.05 (1%)
KOSM 7.07 Decreased By ▼ -0.09 (-1.26%)
MLCF 45.20 Increased By ▲ 1.44 (3.29%)
OGDC 218.38 Increased By ▲ 4.82 (2.26%)
PACE 7.58 Increased By ▲ 0.13 (1.74%)
PAEL 41.70 Increased By ▲ 0.17 (0.41%)
PIAHCLA 17.30 Decreased By ▼ -0.17 (-0.97%)
PIBTL 8.55 Decreased By ▼ -0.05 (-0.58%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 189.03 Decreased By ▼ -0.57 (-0.3%)
PRL 42.33 Decreased By ▼ -1.98 (-4.47%)
PTC 25.17 Increased By ▲ 0.20 (0.8%)
SEARL 103.96 Increased By ▲ 0.59 (0.57%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 39.24 Decreased By ▼ -1.26 (-3.11%)
SYM 19.16 Decreased By ▼ -0.36 (-1.84%)
TELE 9.24 Decreased By ▼ -0.20 (-2.12%)
TPLP 13.10 Decreased By ▼ -0.40 (-2.96%)
TRG 69.18 Increased By ▲ 4.71 (7.31%)
WAVESAPP 10.72 Decreased By ▼ -0.18 (-1.65%)
WTL 1.71 Increased By ▲ 0.06 (3.64%)
YOUW 4.14 Decreased By ▼ -0.07 (-1.66%)
BR100 12,079 Decreased By -111.6 (-0.92%)
BR30 36,602 Increased By 19.8 (0.05%)
KSE100 116,053 Decreased By -202.4 (-0.17%)
KSE30 36,578 Decreased By -25.8 (-0.07%)

Earthquake Relief and Reconstruction Authority (Erra) has planned to hold a conference here in August next to generate funds from philanthropists to bridge the gap between amount collected and the expected expenditure on rehabilitation and reconstruction in Azad Jammu and Kashmir and NWFP.
Erra Deputy Chairman Lieutenant General Nadeem Ahmad during an interaction with the media here on Tuesday said Erra would also sought logistic support and physical involvement of NGOs in rehabilitation and reconstruction operation within the parameters set by the authority.
He said they saw a big response from the people of Karachi in the light of their frontline role in rescue and relief operations after last October's earthquake in AJK and NWFP. There is a strong sentiment of philanthropy in Karachi, he remarked.
He said the rehabilitation and reconstruction work would take around four years to complete as it was really a big task confronting logistics supply and weather challenges besides shortage of skilled manpower.
He said all the constructions would be seismic resistant to minimise the possible human and material loss in case of earthquakes in future.
He underlined the need for behavioural change among the people regarding the construction of houses and other facilities.
"In the past, people went for constructions on adhoc basis. This tendency needs to be corrected in their own benefit," he said.
He said the government was trying to involve local populations in the relief and reconstruction operation to the maximum level for promoting the sense of ownership among them.
He said the government was seriously considering the plan that nation-wide survey should be carried out to identify the constructions vulnerable to earthquake especially in big cities. On completion of the survey, the steps would be suggested to make that quake resistant.

Copyright Associated Press of Pakistan, 2006

Comments

Comments are closed.