AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

Allow me to refer to KESC's performance under privatised management. Frequency of power outages was never as much as it is now. It is taking place both during day and night at all hours.
Their duration varies from a couple of hours to even five hours. The interval between two power outages is sometimes less than even an hour.
There are times during which common sense dictates that there should be no power outage, yet the worst power outages occur during those times. For instance during night all commercial activity remains at a standstill, markets are closed, offices are not open, and many an industrial undertaking is not functioning. According to the KESC's latest Annual Report, 2005, base load demand during the night is 860 MWs only, compared to the day peak demand of 2,104 MWs. Yet the worst power outages are known to occur during the night.
In summer, in the absence of electricity and hence fans sleep is out of the question. Less and less sleep night after night tells adversely on peoples' performance at work during the day. As a result, Karachi's contribution to the gross national product is getting affected qualitatively as well as quantitatively. Is KESC in a position to compensate its consumers for the losses its interruption prone electricity supply is causing them?
Sunday is a closed holiday with the result that not only all the offices without exception are closed, but even a large number of industrial undertakings are closed. Amazingly, on Sundays too power outages lasting for hours are common. This deprives people of their weekly rest.
All this cannot be without a sinister design behind it. It might be that the new private management has not been able to win over the loyalties of the KESC's vast work force, which is not putting forth its best efforts. Rather it is acting hostilely with the management.

Copyright Business Recorder, 2006

Comments

Comments are closed.