AIRLINK 196.20 Increased By ▲ 4.36 (2.27%)
BOP 10.16 Increased By ▲ 0.29 (2.94%)
CNERGY 7.92 Increased By ▲ 0.25 (3.26%)
FCCL 38.30 Increased By ▲ 0.44 (1.16%)
FFL 15.90 Increased By ▲ 0.14 (0.89%)
FLYNG 25.44 Increased By ▲ 0.13 (0.51%)
HUBC 130.65 Increased By ▲ 0.48 (0.37%)
HUMNL 13.79 Increased By ▲ 0.20 (1.47%)
KEL 4.66 Decreased By ▼ -0.01 (-0.21%)
KOSM 6.38 Increased By ▲ 0.17 (2.74%)
MLCF 44.95 Increased By ▲ 0.66 (1.49%)
OGDC 209.79 Increased By ▲ 2.92 (1.41%)
PACE 6.68 Increased By ▲ 0.12 (1.83%)
PAEL 41.05 Increased By ▲ 0.50 (1.23%)
PIAHCLA 17.75 Increased By ▲ 0.16 (0.91%)
PIBTL 8.13 Increased By ▲ 0.06 (0.74%)
POWER 9.38 Increased By ▲ 0.14 (1.52%)
PPL 180.99 Increased By ▲ 2.43 (1.36%)
PRL 40.00 Increased By ▲ 0.92 (2.35%)
PTC 24.41 Increased By ▲ 0.27 (1.12%)
SEARL 111.75 Increased By ▲ 3.90 (3.62%)
SILK 0.99 Increased By ▲ 0.02 (2.06%)
SSGC 38.17 Decreased By ▼ -0.94 (-2.4%)
SYM 19.22 Increased By ▲ 0.10 (0.52%)
TELE 8.75 Increased By ▲ 0.15 (1.74%)
TPLP 12.10 Decreased By ▼ -0.27 (-2.18%)
TRG 66.00 Decreased By ▼ -0.01 (-0.02%)
WAVESAPP 12.29 Decreased By ▼ -0.49 (-3.83%)
WTL 1.69 Decreased By ▼ -0.01 (-0.59%)
YOUW 3.99 Increased By ▲ 0.04 (1.01%)
BR100 12,090 Increased By 159.6 (1.34%)
BR30 35,982 Increased By 322.6 (0.9%)
KSE100 114,866 Increased By 1659.2 (1.47%)
KSE30 36,099 Increased By 534 (1.5%)

Indonesia's state-owned Antam expects its nickel production to fall to between 13,000-16,000 tonnes this year because of a temporary shutdown at its third smelter, the company said on Thursday.
Cameron Tough, Antam's investor relations officer, said the contractor had shut down Antam's third smelter possibly for three months to repair a metal tap hole following a leak at the weekend.
"Contractors are responsible for repairs as the smelter is still in the trial period," Tough said.
"If the repairs go well then hopefully, we'll be able to meet the top of that range. An investigation is still underway," he said.
The company switched on the third ferro-nickel smelter in May after a month's delay from its initial target in April. The smelter has an annual capacity of around 15,000 tonnes of nickel.
The company had earlier lowered its production target this year to 19,000 tonnes of ferro-nickel, a raw material for stainless steel, from 20,000 tonnes due to delays in starting up the third smelter.
Antam also operates two smelters in Sulawesi island with a total output capacity of 11,000 tonnes.

Copyright Reuters, 2006

Comments

Comments are closed.