AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 Increased By 59.3 (0.57%)
BR30 31,226 Increased By 36.9 (0.12%)
KSE100 98,080 Increased By 281.6 (0.29%)
KSE30 30,559 Increased By 78 (0.26%)

The Capital Development Authority Development Working Party (CDADWP) on Thursday approved 10 development schemes costing over Rs 540 million. The meeting to this effect held here with CDA Chairman Kamran Lashari in the chair. Besides, CDA officials, representatives from the Interior Ministry and the Planning Commission also attended the meeting.
THE APPROVED PROJECTS INCLUDE: construction of Fazal-e-Haq Road conversion of existing Northern Carriage way into car parking and construction of new southern carriage way (Rs 185.716 million); the construction of second carriage way of Khayaban-e-Iqbal F-11 (Rs 60.06 million); the dualisation of Nazim-ud-Din Road in sectors F-10 and F-11 (Rs 97.516 million); the construction of second carriage way of Khayaban-e-Iqbal F-10 (Rs 53.020 million); the provision of streetlight poles in poultry and vegetable farms at Park Road (Rs 15.402 million); the improvement in Daman-e-Koh/Pir Sohawa Road intersection with Khayaban-e-Iqbal F-6 (Rs 18.902 million); the installation of streetlight poles from Fazaia Colony to Karal Chowk in the green belt between Islamabad Highway and service road (Rs 4.377 million); the installation of small water purification plants in Islamabad (Rs 7.308 million); the up-gradation of Rose and Jasmine Garden (Rs 55.371 million), and the construction of car parking, widening of existing Daman-e-Koh link road, procurement of golf carts/cars for Daman-e-Koh Viewpoint (Rs 43.241 million).
While two schemes rehabilitation and carpeting of existing street in P and V Scheme-II, Chak Shahzad and dualisation of service road in Sector G-11 were deferred.
The dualisation of Nazim-ud-Din Road would encompass 3.69-km in two sectors, which would be completed within one year. The construction work of second carriage of Khayaban-e-Iqbal is already under way.
Besides, 280 new streetlight poles would be installed and design of old lights would also be changed in poultry and vegetable farms at Park Road.
The second phase of new filtration plants project would also be launched. These plants would be installed in 10 different places, including sectors G-7, G-8/2, I-10, I-14, G-6 and Presidential Estate Colony Awain-e-Sadr.
To ensure smooth flow of traffic, Daman-e-Koh intersection has been redesigned by widening and providing slip lances on all the four turning sides. A roundabout in front of the zoo would also be constructed for easy splitting of traffic towards zoo and Margalla Hills.

Copyright Business Recorder, 2006

Comments

Comments are closed.