AGL 38.99 Decreased By ▼ -0.59 (-1.49%)
AIRLINK 131.56 Increased By ▲ 0.34 (0.26%)
BOP 6.78 Decreased By ▼ -0.03 (-0.44%)
CNERGY 4.66 Decreased By ▼ -0.05 (-1.06%)
DCL 8.55 Increased By ▲ 0.11 (1.3%)
DFML 41.18 Decreased By ▼ -0.29 (-0.7%)
DGKC 81.79 Decreased By ▼ -0.30 (-0.37%)
FCCL 32.78 Decreased By ▼ -0.32 (-0.97%)
FFBL 72.50 Decreased By ▼ -0.37 (-0.51%)
FFL 12.53 Increased By ▲ 0.27 (2.2%)
HUBC 110.80 Increased By ▲ 0.06 (0.05%)
HUMNL 14.12 Decreased By ▼ -0.39 (-2.69%)
KEL 5.15 Decreased By ▼ -0.04 (-0.77%)
KOSM 7.63 Increased By ▲ 0.02 (0.26%)
MLCF 38.80 Decreased By ▼ -0.10 (-0.26%)
NBP 63.15 Decreased By ▼ -0.86 (-1.34%)
OGDC 190.70 Decreased By ▼ -2.12 (-1.1%)
PAEL 25.46 Decreased By ▼ -0.22 (-0.86%)
PIBTL 7.39 Increased By ▲ 0.05 (0.68%)
PPL 151.70 Decreased By ▼ -2.37 (-1.54%)
PRL 25.61 Decreased By ▼ -0.22 (-0.85%)
PTC 17.35 Decreased By ▼ -0.46 (-2.58%)
SEARL 81.23 Decreased By ▼ -1.07 (-1.3%)
TELE 7.75 Decreased By ▼ -0.01 (-0.13%)
TOMCL 33.25 Decreased By ▼ -0.21 (-0.63%)
TPLP 8.39 Decreased By ▼ -0.10 (-1.18%)
TREET 16.90 Increased By ▲ 0.28 (1.68%)
TRG 58.23 Increased By ▲ 0.83 (1.45%)
UNITY 28.10 Increased By ▲ 0.59 (2.14%)
WTL 1.35 Decreased By ▼ -0.02 (-1.46%)
BR100 10,464 Decreased By -40.8 (-0.39%)
BR30 30,978 Decreased By -248.4 (-0.8%)
KSE100 97,860 Decreased By -219.4 (-0.22%)
KSE30 30,466 Decreased By -92.9 (-0.3%)

The revised scheme of dualisation of 7.66-km of Faisalabad-Satiana Road, district Faisalabad, has been approved by the planning and development board Punjab. The revised cost would be Rs 147.607 million and the work on the project was already in progress and the scheme was resubmitted to revise its design and cost.
According to a P&D board's spokesman here on Friday, the scheme was originally approved for an amount of Rs 108.410 million but the Minister for C&W Chaudhry Zaheer ud Din during inspection at site pointed out that there was a stretch of this road between 7.14 km to 7.40 km which was having sharp curves posing serious traffic hazards. On the instructions of the minister, the scheme was redesigned and a revised estimate was submitted to the P&D board for approval.
It may be mentioned here that this project also include the construction of two bridges one at Maduana drain about 4,762 sq. ft. and the other at City Drain about 4,500 sq. ft. besides improvement of by-pass chowk.

Copyright Business Recorder, 2006

Comments

Comments are closed.