AIRLINK 189.64 Decreased By ▼ -7.01 (-3.56%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.68 Decreased By ▼ -0.01 (-0.15%)
FCCL 34.14 Increased By ▲ 1.12 (3.39%)
FFL 17.09 Increased By ▲ 0.44 (2.64%)
FLYNG 23.83 Increased By ▲ 1.38 (6.15%)
HUBC 126.05 Decreased By ▼ -1.24 (-0.97%)
HUMNL 13.79 Decreased By ▼ -0.11 (-0.79%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.58 Increased By ▲ 0.21 (3.3%)
MLCF 43.28 Increased By ▲ 1.06 (2.51%)
OGDC 224.96 Increased By ▲ 11.93 (5.6%)
PACE 7.38 Increased By ▲ 0.37 (5.28%)
PAEL 41.74 Increased By ▲ 0.87 (2.13%)
PIAHCLA 17.19 Increased By ▲ 0.37 (2.2%)
PIBTL 8.41 Increased By ▲ 0.12 (1.45%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 193.09 Increased By ▲ 9.52 (5.19%)
PRL 37.34 Decreased By ▼ -0.93 (-2.43%)
PTC 24.02 Decreased By ▼ -0.05 (-0.21%)
SEARL 94.54 Decreased By ▼ -0.57 (-0.6%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.93 Decreased By ▼ -0.38 (-0.94%)
SYM 17.77 Decreased By ▼ -0.44 (-2.42%)
TELE 8.66 Decreased By ▼ -0.07 (-0.8%)
TPLP 12.39 Increased By ▲ 0.18 (1.47%)
TRG 62.65 Decreased By ▼ -1.71 (-2.66%)
WAVESAPP 10.28 Decreased By ▼ -0.16 (-1.53%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
YOUW 3.97 Decreased By ▼ -0.03 (-0.75%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

Punjab Minister for Communication & Works, Chaudhry Zaheer-ud-Din Khan has said that construction of District Jail Toba Tek Singh would be completed by the end of this year and Rs 98.635 million would be spent on this project.
He said this, while presiding over a meeting at his office, here on Monday. Secretary C&W, Additional Secretary Technical, Chief Engineer Works and other officers attended the meeting.
The meeting was informed that barracks, death cells, watch towers, administration block, factory shed, godown and perimeter wall of the jail had been constructed.
The minister was informed that Rs 95.635 million had already been spent up to June 2006 on this project whereas Rs 3 million had been allocated for the current fiscal year. He directed the Chief Engineer Works to speed up work on the project so that it could be completed within stipulated period. He also directed to ensure the quality of construction material.

Copyright Business Recorder, 2006

Comments

Comments are closed.