AGL 38.54 Increased By ▲ 0.97 (2.58%)
AIRLINK 129.50 Decreased By ▼ -3.00 (-2.26%)
BOP 5.61 Decreased By ▼ -0.03 (-0.53%)
CNERGY 3.86 Increased By ▲ 0.09 (2.39%)
DCL 8.73 Decreased By ▼ -0.14 (-1.58%)
DFML 41.76 Increased By ▲ 0.76 (1.85%)
DGKC 88.30 Decreased By ▼ -1.86 (-2.06%)
FCCL 35.00 Decreased By ▼ -0.08 (-0.23%)
FFBL 67.35 Increased By ▲ 0.85 (1.28%)
FFL 10.61 Increased By ▲ 0.46 (4.53%)
HUBC 108.76 Increased By ▲ 2.36 (2.22%)
HUMNL 14.66 Increased By ▲ 1.26 (9.4%)
KEL 4.75 Decreased By ▼ -0.11 (-2.26%)
KOSM 6.95 Increased By ▲ 0.10 (1.46%)
MLCF 41.65 Decreased By ▼ -0.15 (-0.36%)
NBP 59.60 Increased By ▲ 1.02 (1.74%)
OGDC 183.00 Increased By ▲ 1.75 (0.97%)
PAEL 26.25 Increased By ▲ 0.55 (2.14%)
PIBTL 5.97 Increased By ▲ 0.14 (2.4%)
PPL 146.70 Decreased By ▼ -1.70 (-1.15%)
PRL 23.61 Increased By ▲ 0.39 (1.68%)
PTC 16.56 Increased By ▲ 1.32 (8.66%)
SEARL 68.30 Decreased By ▼ -0.49 (-0.71%)
TELE 7.23 Decreased By ▼ -0.01 (-0.14%)
TOMCL 35.95 Decreased By ▼ -0.05 (-0.14%)
TPLP 7.85 Increased By ▲ 0.45 (6.08%)
TREET 14.20 Decreased By ▼ -0.04 (-0.28%)
TRG 50.45 Decreased By ▼ -0.40 (-0.79%)
UNITY 26.75 Increased By ▲ 0.35 (1.33%)
WTL 1.21 No Change ▼ 0.00 (0%)
BR100 9,806 Increased By 37.8 (0.39%)
BR30 29,678 Increased By 278.1 (0.95%)
KSE100 92,304 Increased By 366.3 (0.4%)
KSE30 28,840 Increased By 96.6 (0.34%)

The Japan Special Fund will provide $900,000 for Power Distribution Enhancement Project of Pakistan to technical project design; economic and financial evaluations; compliance with the national and ADB's safeguard policies; and linkages among economic growth, poverty, and the power sector.
According to official sources, the purpose of the PPTA is to support the government's strategy for continued poverty reduction through sustained economic growth by assisting in the preparation of a power distribution enhancement project to ensure a sufficient and stable power supply through the distribution system in Pakistan.
The project will also improve system stability and security, reduce losses, and improve the reliability of supply through (i) the construction and upgrading of 132 kV, 66 kV, 32 kV, and 11 kV distribution lines, (ii) construction of 132 kV substations and 66 kV substations, (iii) extension of 132 kV and 66 kV substations, and (iv) installation of upgrading of the metering systems, meters, and billing and collection systems.
The power sector is currently undergoing reforms and restructuring, supported by ADB. In the transition phase, sector sustainability needs to be ensured. By providing liquidity for augmentation and expansion projects as well as for larger maintenance work, the proposed project will contribute to achieving sustainability in the sector.
To achieve the economic growth targets the government has set the power sector needs to increase its generation capacity, efficiency and coverage. The project will also increase the confidence of commercial financiers in financing long-term transmission and distribution assets during the transmission period.

Copyright Business Recorder, 2006

Comments

Comments are closed.