AGL 39.55 Decreased By ▼ -0.45 (-1.13%)
AIRLINK 128.58 Decreased By ▼ -0.48 (-0.37%)
BOP 6.85 Increased By ▲ 0.10 (1.48%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.41 Decreased By ▼ -0.14 (-1.64%)
DFML 41.05 Increased By ▲ 0.23 (0.56%)
DGKC 82.00 Increased By ▲ 1.04 (1.28%)
FCCL 33.00 Increased By ▲ 0.23 (0.7%)
FFBL 74.00 Decreased By ▼ -0.43 (-0.58%)
FFL 11.89 Increased By ▲ 0.15 (1.28%)
HUBC 110.03 Increased By ▲ 0.45 (0.41%)
HUMNL 14.11 Increased By ▲ 0.36 (2.62%)
KEL 5.21 Decreased By ▼ -0.10 (-1.88%)
KOSM 7.48 Decreased By ▼ -0.24 (-3.11%)
MLCF 39.00 Increased By ▲ 0.40 (1.04%)
NBP 63.70 Increased By ▲ 0.19 (0.3%)
OGDC 192.80 Decreased By ▼ -1.89 (-0.97%)
PAEL 25.65 Decreased By ▼ -0.06 (-0.23%)
PIBTL 7.30 Decreased By ▼ -0.09 (-1.22%)
PPL 153.21 Decreased By ▼ -2.24 (-1.44%)
PRL 25.92 Increased By ▲ 0.13 (0.5%)
PTC 17.55 Increased By ▲ 0.05 (0.29%)
SEARL 80.90 Increased By ▲ 2.25 (2.86%)
TELE 7.67 Decreased By ▼ -0.19 (-2.42%)
TOMCL 33.30 Decreased By ▼ -0.43 (-1.27%)
TPLP 8.44 Increased By ▲ 0.04 (0.48%)
TREET 16.52 Increased By ▲ 0.25 (1.54%)
TRG 56.70 Decreased By ▼ -1.52 (-2.61%)
UNITY 27.55 Increased By ▲ 0.06 (0.22%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,510 Increased By 64.7 (0.62%)
BR30 31,121 Decreased By -68.3 (-0.22%)
KSE100 98,250 Increased By 451.7 (0.46%)
KSE30 30,665 Increased By 184.3 (0.6%)

Claro Bito Diez has joined the Pak Gulf Construction Company Ltd (PGCL) as Senior Planning Engineer, said a press release here on Tuesday. He has been working with Al-Rashid Trading Company in Saudi Arabia in the same position.
He is a well-recognised figure with 18-year international experience in construction engineering, having an overall experience of 22 years of project management, construction management, and general contracts, the statement added.
He has been part of the professionals who built Malaysia's tallest tower Petronas, Terminal Airport, Philippines, and Polyethylene Plant, Saudi Arabia. His past assignments were tender evaluation, construction engineering, designing, formulating overall project master schedule and setting up cost-control system.-PR

Copyright Business Recorder, 2006

Comments

Comments are closed.