AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

imageISLAMABAD: The government Wednesday signed four agreements to set up two coal based power plants of 1650 MW in Hub and Thar under China Pakistan Economic Corridor (CPEC) project.

The agreements included two each for implementation and power purchase.

The agreements were signed by representatives of China Power Hub Generation Company (Private) Limited (CPHGC), HUBCO and Private Power Infrastructure Board (PPIB) on behalf of their respective organizations.

Minister for Water and Power Khawaja Muhammad Asif and Secretary Water and Power Mohammad Younas Dagha also witnessed the signing ceremony.

Under the agreements, 1320 MW coal fired power plant is being set up in Hub, Balochistan with at estimated cost of over $ 2 billion while 330 MW will be established in Thar, Sindh at a cost of $ 500 million.

The 1320 MW power project would be completed by August 2019 while 330 MW Thar project would start generation by December 2019.

Terming both the projects a major milestone, Khawaja Muhammad Asif said construction work on 1320 MW power plant had already started and both the projects would be completed in 2019.

He said the government was also fully implementing projects to be completed after its tenure keeping in view the future requirements of energy.

Asif said preference was being given to use local coal from Thar for generating cheap electricity. These projects would open up new chapter in the energy sector, he said adding that Thar would be centre of energy for the country in future.

He said it would not only help save precious foreign exchange but also generate electricity at affordable rates to the consumers.

The minister said that signing of the agreements were a great achievement.

Responding to a question, the minister said 1320 MW power project was based on super critical technology while 330 MW power project was based on sub-critical technology.

Regarding Thar project, he said it was a pilot project and it would attract huge investment in future.

To another question, the minister said equal attention was also being given on up-gradation of transmission system. Work on up- gradation of transmission lines was also being carried out simultaneously, he added.

To a query, Asif said Nandipur power plant was supplying 430 MW and furnace oil treatment plant (FOTP) had already been setup. Gasification process of the plant has already been started and it would be run on gas in May, he said.

He said payment had also been made to Sui Northern Gas Company for laying pipeline to supply gas to the plant.

Regarding Bhasha and Mohmand dams, the minister said ground breaking of both projects would be carried out this year. The reservoirs would be constructed from our own resources, he added.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed.