AIRLINK 189.64 Decreased By ▼ -7.01 (-3.56%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.68 Decreased By ▼ -0.01 (-0.15%)
FCCL 34.14 Increased By ▲ 1.12 (3.39%)
FFL 17.09 Increased By ▲ 0.44 (2.64%)
FLYNG 23.83 Increased By ▲ 1.38 (6.15%)
HUBC 126.05 Decreased By ▼ -1.24 (-0.97%)
HUMNL 13.79 Decreased By ▼ -0.11 (-0.79%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.58 Increased By ▲ 0.21 (3.3%)
MLCF 43.28 Increased By ▲ 1.06 (2.51%)
OGDC 224.96 Increased By ▲ 11.93 (5.6%)
PACE 7.38 Increased By ▲ 0.37 (5.28%)
PAEL 41.74 Increased By ▲ 0.87 (2.13%)
PIAHCLA 17.19 Increased By ▲ 0.37 (2.2%)
PIBTL 8.41 Increased By ▲ 0.12 (1.45%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 193.09 Increased By ▲ 9.52 (5.19%)
PRL 37.34 Decreased By ▼ -0.93 (-2.43%)
PTC 24.02 Decreased By ▼ -0.05 (-0.21%)
SEARL 94.54 Decreased By ▼ -0.57 (-0.6%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.93 Decreased By ▼ -0.38 (-0.94%)
SYM 17.77 Decreased By ▼ -0.44 (-2.42%)
TELE 8.66 Decreased By ▼ -0.07 (-0.8%)
TPLP 12.39 Increased By ▲ 0.18 (1.47%)
TRG 62.65 Decreased By ▼ -1.71 (-2.66%)
WAVESAPP 10.28 Decreased By ▼ -0.16 (-1.53%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
YOUW 3.97 Decreased By ▼ -0.03 (-0.75%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

Punjab Minister for Communication and Works, Chaudhry Zaheer-ud-Din Khan has said that underpass would be constructed at Muslim Town to reduce traffic pressure at Ferozepur Road.
He was presiding over a high level meeting at his residence, on Sunday. Secretary C&W Ahmadyar Khan, Addl. Secretary (Technical) Masood-ur-Rasool, Deputy Secretary Highways Yunis Aziz, Chief Engineer Highways (North) Muhammad Iqbal Khokhar, Superintending Engineer Munawar Bashir and other officers attended the meeting.
The meeting was informed that Planning and Development Department has given approval for the construction of Muslim Town underpass. Tender of this underpass would be called and work would be started soon on this mega project. The meeting also reviewed the pace of work on ongoing schemes in Lahore.
The minister was informed that work in progress on 18 schemes with the total cost of Rs 5,052 million in the provincial capital and out of which 10 schemes would be completed during the current fiscal year. The minister directed the Chief Engineer Highways to accelerate the pace of work so that these schemes could be completed in time. He warned that strict action would be taken against such officers who failed to complete the schemes within stipulated period.

Copyright Pakistan Press International, 2007

Comments

Comments are closed.