AGL 38.10 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 136.75 Increased By ▲ 2.56 (1.91%)
BOP 9.22 Increased By ▲ 0.37 (4.18%)
CNERGY 4.75 Increased By ▲ 0.06 (1.28%)
DCL 8.83 Increased By ▲ 0.16 (1.85%)
DFML 38.44 Decreased By ▼ -1.34 (-3.37%)
DGKC 85.40 Increased By ▲ 0.25 (0.29%)
FCCL 35.35 Increased By ▲ 0.45 (1.29%)
FFBL 76.99 Increased By ▲ 1.39 (1.84%)
FFL 12.70 Decreased By ▼ -0.04 (-0.31%)
HUBC 108.79 Decreased By ▼ -0.66 (-0.6%)
HUMNL 14.74 Increased By ▲ 0.64 (4.54%)
KEL 5.55 Increased By ▲ 0.15 (2.78%)
KOSM 8.05 Increased By ▲ 0.30 (3.87%)
MLCF 40.70 Decreased By ▼ -0.67 (-1.62%)
NBP 71.40 Increased By ▲ 1.70 (2.44%)
OGDC 194.75 Increased By ▲ 1.13 (0.58%)
PAEL 27.00 Increased By ▲ 0.79 (3.01%)
PIBTL 7.48 Increased By ▲ 0.06 (0.81%)
PPL 167.95 Increased By ▲ 4.10 (2.5%)
PRL 26.25 Decreased By ▼ -0.11 (-0.42%)
PTC 20.40 Increased By ▲ 0.93 (4.78%)
SEARL 92.84 Increased By ▲ 8.44 (10%)
TELE 7.89 Decreased By ▼ -0.10 (-1.25%)
TOMCL 35.32 Increased By ▲ 1.27 (3.73%)
TPLP 8.98 Increased By ▲ 0.26 (2.98%)
TREET 17.34 Increased By ▲ 0.16 (0.93%)
TRG 59.50 Decreased By ▼ -1.50 (-2.46%)
UNITY 31.00 Increased By ▲ 2.04 (7.04%)
WTL 1.39 Increased By ▲ 0.02 (1.46%)
BR100 10,895 Increased By 118.9 (1.1%)
BR30 32,660 Increased By 426.2 (1.32%)
KSE100 101,357 Increased By 1274.6 (1.27%)
KSE30 31,488 Increased By 295 (0.95%)

Karachi City Nazim Mustafa Kamal has announced to undertake construction of roads at a cost of Rs 600 million, soon after completion of the water and sewerage projects currently being executed in the metropolis.
He said that the incumbent City District Government of Karachi (CDGK) had taken up the water crisis issue seriously and initiated several water and sewerage projects. He said that laying new water pipelines at estimated cost of Rs 60 million and reconstruction of roads with Rs 600 million was in full swing in the city.
Talking to newsmen after inauguration of the water and sewerage projects on Friday, he said that the CDGK would resolve all outstanding water and sewerage issues faced by the residents of Gulistan-e-Johar by the end of current year.
On this occasion, additional vice-chairman and MPA Imamuddin Shahzad, Gulshan Town Nazim Wasay Jalil, UC nazims and naib nazims besides scores of area residents were also present.
The City Nazim observed that Karachiites were facing water problems for the last 30 years. He expressed hope that these would be resolved on priority basis. "Development of civic infrastructure is CDGK's prime policy," he added.
At present, laying of water and sewerage lines is underway. These include the sewerage pipelines of 8-in, 12-in, 15-in, 18-in and 24-inch diameters," he added. These different diameter lines are being laid from Pehalwan Goth to Sumam Shopping Centre and Johar Bridge to Johar Chowrangi.

Copyright Business Recorder, 2007

Comments

Comments are closed.