AGL 40.01 Decreased By ▼ -0.02 (-0.05%)
AIRLINK 128.34 Increased By ▲ 0.64 (0.5%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.53 Decreased By ▼ -0.07 (-1.52%)
DCL 9.24 Increased By ▲ 0.45 (5.12%)
DFML 41.58 No Change ▼ 0.00 (0%)
DGKC 87.06 Increased By ▲ 1.27 (1.48%)
FCCL 32.60 Increased By ▲ 0.11 (0.34%)
FFBL 64.50 Increased By ▲ 0.47 (0.73%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 111.75 Increased By ▲ 0.98 (0.88%)
HUMNL 14.84 Decreased By ▼ -0.23 (-1.53%)
KEL 5.05 Increased By ▲ 0.17 (3.48%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.86 Increased By ▲ 0.34 (0.84%)
NBP 61.40 Increased By ▲ 0.35 (0.57%)
OGDC 195.55 Increased By ▲ 0.68 (0.35%)
PAEL 27.55 Increased By ▲ 0.04 (0.15%)
PIBTL 7.69 Decreased By ▼ -0.12 (-1.54%)
PPL 153.30 Increased By ▲ 0.77 (0.5%)
PRL 26.75 Increased By ▲ 0.17 (0.64%)
PTC 16.20 Decreased By ▼ -0.06 (-0.37%)
SEARL 83.51 Decreased By ▼ -0.63 (-0.75%)
TELE 7.86 Decreased By ▼ -0.10 (-1.26%)
TOMCL 36.48 Decreased By ▼ -0.12 (-0.33%)
TPLP 8.95 Increased By ▲ 0.29 (3.35%)
TREET 17.00 Decreased By ▼ -0.66 (-3.74%)
TRG 59.15 Increased By ▲ 0.53 (0.9%)
UNITY 27.51 Increased By ▲ 0.65 (2.42%)
WTL 1.33 Decreased By ▼ -0.05 (-3.62%)
BR100 10,000 No Change 0 (0%)
BR30 31,002 No Change 0 (0%)
KSE100 94,960 Increased By 768 (0.82%)
KSE30 29,500 Increased By 298.4 (1.02%)

Foreign investment of up to 25 billion dollars is expected in the Punjab province, which will ensure economic growth, promote local industry and create jobs for thousands of people. This was told by Punjab Minister for Public Health Engineering (PHE), Hasan Akhtar Mokal while talking to APP.
He said that there had been a 120 percent increase in trade with China. He said that the Punjab government was providing health facilities, including provision of clean drinking water, to the masses at grassroots level.
As many as 1,000 water schemes costing rupees five billion were being completed in the province, including water treatment plants and testing laboratories were being established.
Through another project, old and eroded pipelines for drinking water, and for sewerage system, were being replaced. The work would be completed by the end of this year, he said.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.