AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

Expressing deep concern over the looming power crisis in the country, Pakistan Peoples Party on Friday alleged that it was due to corruption, neglect and mis-governance in the power sector and asked the regime to address it urgently.
In a statement here, PPP spokesperson former Senator Farhatullah Babar said load shedding in hot summer had not only made the lives of people miserable but also led to closure of industries and adversely affected national productivity.
General Musharraf had been making promises of ending load shedding for the past several years but the pathetic state of power sector mocks at the tall claims of the regime, he said.
The PPP government during the three-year period between 1993-96 added 7,000 megawatts to the national grid from the independent power producers (IPPs) and another 1000 MW from Ghazi Barotha hydel station, he said. But the addition to the national grid during eight years of Musharraf rule had been dismal at less than 2,000 MW, he said.
Corruption and bad governance lay at the root of the problem, which was evident from the way KESC was privatised in a non-transparent manner and the utility was sold to a group who reportedly had not even seen a power plant, let alone owning and operating it, he claimed.
He asked the regime to address the issue of power shortage on urgent basis instead of wasting public funds on non-productive projects like building another GHQ in Islamabad.

Copyright Pakistan Press International, 2007

Comments

Comments are closed.