AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 129.01 Decreased By ▼ -2.21 (-1.68%)
BOP 6.75 Decreased By ▼ -0.06 (-0.88%)
CNERGY 4.61 Decreased By ▼ -0.10 (-2.12%)
DCL 8.40 Decreased By ▼ -0.04 (-0.47%)
DFML 41.00 Decreased By ▼ -0.47 (-1.13%)
DGKC 81.40 Decreased By ▼ -0.69 (-0.84%)
FCCL 32.71 Decreased By ▼ -0.39 (-1.18%)
FFBL 71.51 Decreased By ▼ -1.36 (-1.87%)
FFL 12.30 Increased By ▲ 0.04 (0.33%)
HUBC 110.39 Decreased By ▼ -0.35 (-0.32%)
HUMNL 14.45 Decreased By ▼ -0.06 (-0.41%)
KEL 5.13 Decreased By ▼ -0.06 (-1.16%)
KOSM 7.51 Decreased By ▼ -0.10 (-1.31%)
MLCF 38.70 Decreased By ▼ -0.20 (-0.51%)
NBP 63.00 Decreased By ▼ -1.01 (-1.58%)
OGDC 189.99 Decreased By ▼ -2.83 (-1.47%)
PAEL 25.35 Decreased By ▼ -0.33 (-1.29%)
PIBTL 7.33 Decreased By ▼ -0.01 (-0.14%)
PPL 150.50 Decreased By ▼ -3.57 (-2.32%)
PRL 25.55 Decreased By ▼ -0.28 (-1.08%)
PTC 17.50 Decreased By ▼ -0.31 (-1.74%)
SEARL 81.00 Decreased By ▼ -1.30 (-1.58%)
TELE 7.70 Decreased By ▼ -0.06 (-0.77%)
TOMCL 32.90 Decreased By ▼ -0.56 (-1.67%)
TPLP 8.35 Decreased By ▼ -0.14 (-1.65%)
TREET 16.47 Decreased By ▼ -0.15 (-0.9%)
TRG 56.70 Decreased By ▼ -0.70 (-1.22%)
UNITY 27.75 Increased By ▲ 0.24 (0.87%)
WTL 1.35 Decreased By ▼ -0.02 (-1.46%)
BR100 10,407 Decreased By -97.2 (-0.92%)
BR30 30,849 Decreased By -377.8 (-1.21%)
KSE100 97,589 Decreased By -491 (-0.5%)
KSE30 30,354 Decreased By -204.5 (-0.67%)

Because of continual low voltage supply, the input cable installed in the substation, which supplies electricity to 'Recorder House', blew up on Sunday, causing serious problems in the functioning of Aaj TV and Business Recorder.
According to details, the input cable installed to supply electricity to Recorder House suddenly blew up at around 5:00 am due to low voltage, as a result of which the units functioning in Recorder House had to face complete power breakdown.
Just after the power breakdown, Karachi Electric Supply Corporation (KESC) was informed. However, the officials from the utility visited the site at 3:00 pm, and went back after carrying out survey of the site.
Later, a KESC vehicle with its workforce came at around 5:00 pm and started repair work. The power supply could be restored at 6:00 pm--after 11 hours of the breakdown.

Copyright Business Recorder, 2007

Comments

Comments are closed.