AGL 39.65 Decreased By ▼ -0.35 (-0.88%)
AIRLINK 129.78 Increased By ▲ 0.72 (0.56%)
BOP 6.80 Increased By ▲ 0.05 (0.74%)
CNERGY 4.70 Increased By ▲ 0.21 (4.68%)
DCL 8.50 Decreased By ▼ -0.05 (-0.58%)
DFML 41.07 Increased By ▲ 0.25 (0.61%)
DGKC 81.55 Increased By ▲ 0.59 (0.73%)
FCCL 32.80 Increased By ▲ 0.03 (0.09%)
FFBL 74.45 Increased By ▲ 0.02 (0.03%)
FFL 11.92 Increased By ▲ 0.18 (1.53%)
HUBC 109.90 Increased By ▲ 0.32 (0.29%)
HUMNL 14.34 Increased By ▲ 0.59 (4.29%)
KEL 5.25 Decreased By ▼ -0.06 (-1.13%)
KOSM 7.70 Decreased By ▼ -0.02 (-0.26%)
MLCF 38.41 Decreased By ▼ -0.19 (-0.49%)
NBP 65.47 Increased By ▲ 1.96 (3.09%)
OGDC 193.23 Decreased By ▼ -1.46 (-0.75%)
PAEL 25.78 Increased By ▲ 0.07 (0.27%)
PIBTL 7.39 No Change ▼ 0.00 (0%)
PPL 154.10 Decreased By ▼ -1.35 (-0.87%)
PRL 25.42 Decreased By ▼ -0.37 (-1.43%)
PTC 17.60 Increased By ▲ 0.10 (0.57%)
SEARL 79.75 Increased By ▲ 1.10 (1.4%)
TELE 7.74 Decreased By ▼ -0.12 (-1.53%)
TOMCL 33.74 Increased By ▲ 0.01 (0.03%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.28 Increased By ▲ 0.01 (0.06%)
TRG 57.60 Decreased By ▼ -0.62 (-1.06%)
UNITY 27.68 Increased By ▲ 0.19 (0.69%)
WTL 1.39 No Change ▼ 0.00 (0%)
BR100 10,605 Increased By 159.4 (1.53%)
BR30 31,180 Decreased By -9 (-0.03%)
KSE100 99,307 Increased By 1508.9 (1.54%)
KSE30 31,036 Increased By 555.8 (1.82%)

PIE and a German multinational company have entered into a contract to construct a 40 MW grid station at Sundar Industrial Estate at a cost of Rs 138 million, which would be completed in 11 months.
The contract between Punjab Industrial Estates Development and Management Company (PIEDMC) and Siemens Pakistan Engineering Company Limited was signed at PIEDMC office, a day earlier. Saber Pervaiz Chohan, Chief Executive Officer signed on behalf of PIEDMC whereas Shaukat Ali Hassan signed the document on behalf of Siemens.
According to details M/S Siemens will construct 40 MVA, 132/11.5 kV Grid Station at Sunder Industrial Estate at a total cost of Rs 138 million within a period of 11 months. Ground breaking ceremony will take place within one week at the site of the proposed grid station. On completion of the grid station, Industrial connections in the estate will further grow to accelerate the ongoing pace of industrialisation in Punjab.

Copyright Business Recorder, 2007

Comments

Comments are closed.