AIRLINK 200.29 Increased By ▲ 2.74 (1.39%)
BOP 10.49 Increased By ▲ 0.22 (2.14%)
CNERGY 7.21 Increased By ▲ 0.26 (3.74%)
FCCL 34.94 Increased By ▲ 0.52 (1.51%)
FFL 17.42 Decreased By ▼ -0.24 (-1.36%)
FLYNG 24.85 Increased By ▲ 0.25 (1.02%)
HUBC 127.81 Increased By ▲ 0.08 (0.06%)
HUMNL 13.81 Decreased By ▼ -0.02 (-0.14%)
KEL 5.00 Increased By ▲ 0.12 (2.46%)
KOSM 7.03 Increased By ▲ 0.34 (5.08%)
MLCF 44.62 Increased By ▲ 0.47 (1.06%)
OGDC 222.15 Decreased By ▼ -2.76 (-1.23%)
PACE 7.42 Decreased By ▼ -0.08 (-1.07%)
PAEL 42.80 Decreased By ▼ -0.06 (-0.14%)
PIAHCLA 17.39 Increased By ▲ 0.17 (0.99%)
PIBTL 8.51 Decreased By ▼ -0.03 (-0.35%)
POWER 9.15 Increased By ▲ 0.03 (0.33%)
PPL 192.73 Decreased By ▼ -1.57 (-0.81%)
PRL 41.50 Increased By ▲ 2.74 (7.07%)
PTC 24.44 Increased By ▲ 0.10 (0.41%)
SEARL 101.27 Increased By ▲ 1.40 (1.4%)
SILK 1.05 Increased By ▲ 0.05 (5%)
SSGC 43.87 Increased By ▲ 0.11 (0.25%)
SYM 18.76 Increased By ▲ 0.18 (0.97%)
TELE 9.54 Increased By ▲ 0.42 (4.61%)
TPLP 13.08 Increased By ▲ 0.12 (0.93%)
TRG 66.19 Increased By ▲ 2.09 (3.26%)
WAVESAPP 10.53 Increased By ▲ 0.16 (1.54%)
WTL 1.78 No Change ▼ 0.00 (0%)
YOUW 4.04 Increased By ▲ 0.02 (0.5%)
BR100 12,040 Increased By 72 (0.6%)
BR30 36,689 Increased By 5 (0.01%)
KSE100 114,804 Increased By 574.1 (0.5%)
KSE30 36,102 Increased By 118.3 (0.33%)

Sindh Governor, Dr Ishratul Ibad Khan has called upon the KESC to carry out its short and long term plans, particularly with reference to power generation programme, on a fast track basis.
"The problems in next summer must be lesser than the ones faced this summer" he emphasised and added that work being done on all the projects must be visible to people. He was addressing a meeting held at Governor House here on Saturday in which various power generation issues of the corporation came under consideration.
Those attending the meeting included Chief Secretary Shakil Durrani, Principal Secretary Saleem Khan and others besides John Kim, CEO of a South Korean Engineering Company. John Kim while showing interest in the setting up of a power generation plant in Karachi said that he wants to make investment on BOT basis to set up a 1,000 MW plant.
He informed that the company could supply 47 MW furnace oil operated plants in 11 months, which can be installed immediately. The governor directed that installation of these plants in industrial units should be considered. He asked the corporation to sort out details with the Korean company at the earliest. The chief secretary informed the meeting that provinces, too, could generate energy.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.