AGL 38.35 Increased By ▲ 0.33 (0.87%)
AIRLINK 212.11 Increased By ▲ 14.75 (7.47%)
BOP 9.81 Increased By ▲ 0.27 (2.83%)
CNERGY 6.44 Increased By ▲ 0.53 (8.97%)
DCL 9.19 Increased By ▲ 0.37 (4.2%)
DFML 38.10 Increased By ▲ 2.36 (6.6%)
DGKC 100.87 Increased By ▲ 4.01 (4.14%)
FCCL 35.93 Increased By ▲ 0.68 (1.93%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 133.90 Increased By ▲ 6.35 (4.98%)
HUMNL 13.70 Increased By ▲ 0.20 (1.48%)
KEL 5.67 Increased By ▲ 0.35 (6.58%)
KOSM 7.27 Increased By ▲ 0.27 (3.86%)
MLCF 45.45 Increased By ▲ 0.75 (1.68%)
NBP 61.60 Increased By ▲ 0.18 (0.29%)
OGDC 232.75 Increased By ▲ 18.08 (8.42%)
PAEL 40.97 Increased By ▲ 2.18 (5.62%)
PIBTL 8.54 Increased By ▲ 0.29 (3.52%)
PPL 203.80 Increased By ▲ 10.72 (5.55%)
PRL 40.01 Increased By ▲ 1.35 (3.49%)
PTC 27.74 Increased By ▲ 1.94 (7.52%)
SEARL 108.00 Increased By ▲ 4.40 (4.25%)
TELE 8.72 Increased By ▲ 0.42 (5.06%)
TOMCL 36.30 Increased By ▲ 1.30 (3.71%)
TPLP 13.95 Increased By ▲ 0.65 (4.89%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.40 Increased By ▲ 1.43 (4.34%)
WTL 1.73 Increased By ▲ 0.13 (8.13%)
BR100 12,231 Increased By 504.7 (4.3%)
BR30 38,263 Increased By 1885.9 (5.18%)
KSE100 113,866 Increased By 4353.3 (3.98%)
KSE30 36,032 Increased By 1519 (4.4%)

Nowadays, without any prior notice to consumers, KESC is replacing old serviceable electricity meters by new meters, which are alleged to be pre-engineered fast in function as experienced by general consumers who have already fallen victim of this high-handedness of KESC.
The process of meter change consumes 8-10 hours of sudden power cut. This pain, under sweating heat is being thrusted upon consumers by KESC, in addition to their on-going curb of frequent loadshedding.
As per the terms and conditions of contract for electric supply between KESC and consumer, either party is legally bound to communicate the intended change of meter prior to its replacement for any reason, which KESC has failed to comply and is changing meters arbitrarily.
The new plastic meters manufactured by a company in Lahore, purchased a few years back in a suspected deal, were found faulty, unworthy and lying useless in KESC stores. However, the KESC officials involved in meters purchase deal, in order to save their neck from accountability of this huge financial deficit, forced bulk installation of meters in haphazard and disorganised manner. KESC staff engaged on the job of replacement of meters, leave bunch of wires in over the meters.
The bunch of loose (-) negative and (+) positive wires in close contact, can spark and may cause fire, resulting in a big disaster leading to loss of life in residential areas, as already happened in some areas of Karachi.
The KESC technicians deployed on job of meter change do not listen to the consumers' pleas and no KESC engineer bothers to monitor the work professionally, ensure safety measures and resolve consumer's problems owing to meter change, before leaving the spot. In the whole process of meter replacement, the required safety standards are not fulfilled, posing danger to the lives of consumers. The concerned officials are requested to arrange proper fixation of loose electric wires to ensure safety.

Copyright Business Recorder, 2007

Comments

Comments are closed.