AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 Increased By 59.3 (0.57%)
BR30 31,226 Increased By 36.9 (0.12%)
KSE100 98,080 Increased By 281.6 (0.29%)
KSE30 30,559 Increased By 78 (0.26%)

The National Highway Authority (NHA) has completed M-1, Peshawar-Islamabad Motorway Project with the cost of Rs 15 billion and would be opened very soon for all kind of traffic and the project will be formally inaugurated by President General Pervez Musharraf.
This was stated by General Manager M-1, Chaudhry Mujeeb Qadir while talking to APP here on Tuesday. The construction work on this 154km long road started in 2002 and first phase of Islamabad-Burhan was opened for all kind of traffic in 2005.
He said that this 154km long road contained 27 small bridges, three vast bridges on River Kabul, Indus and Harro and three road crosses over rail bridges at Fathejhang, Burhan and Rashaki were constructed for smooth travelling.
"On motorway, U-turn is available after every ten kilometres and it contained 18 flyovers, 100 underpasses, 571 culverts, while 10 service areas will be provided on both sides of Motorway for rest and dine of commuters", he added.
Mujeeb Qadir continued that eight interchanges are also constructed at Fathejang, Bahatar, Burhan, Ghourghushti (Chach area), Rashaki, Swabi, Charsadda and Peshawar for the convenience of the passengers. "International standard was followed in the construction of this important project", Chaudhry Mujeeb Qadir added.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.