AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 Increased By 59.3 (0.57%)
BR30 31,226 Increased By 36.9 (0.12%)
KSE100 98,080 Increased By 281.6 (0.29%)
KSE30 30,559 Increased By 78 (0.26%)

Pepco has said the current power supply situation in the country has started easing off pressure, though, there will be possible power cuts in coming days, barring load management in the peak hours, from 6pm to 10pm.
A Pepco spokesman said that after hectic efforts, most of the IPPs earlier on scheduled shut downs have been brought back last night. These include the Uch Power (570 MW) and the PAEC Chashnup Power (300MW). The 180 MW Thermal Unit at TPS Muzaffargarh has also started generation after it shut down.
The Indus River System Authority (IRSA) has also increased water releases from Mangla and Tarbela reservoirs, resulting in increasing the power generation from these two sources. The 1, 538 MW KAPCO Power Plant has started receiving gas, which had earlier been curtailed. This help from SNGFL will also help ease the problem.

Copyright Business Recorder, 2007

Comments

Comments are closed.