AGL 40.02 Decreased By ▼ -0.01 (-0.02%)
AIRLINK 127.99 Increased By ▲ 0.29 (0.23%)
BOP 6.66 Increased By ▲ 0.05 (0.76%)
CNERGY 4.44 Decreased By ▼ -0.16 (-3.48%)
DCL 8.75 Decreased By ▼ -0.04 (-0.46%)
DFML 41.24 Decreased By ▼ -0.34 (-0.82%)
DGKC 86.18 Increased By ▲ 0.39 (0.45%)
FCCL 32.40 Decreased By ▼ -0.09 (-0.28%)
FFBL 64.89 Increased By ▲ 0.86 (1.34%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.51 Increased By ▲ 1.74 (1.57%)
HUMNL 14.75 Decreased By ▼ -0.32 (-2.12%)
KEL 5.08 Increased By ▲ 0.20 (4.1%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.44 Decreased By ▼ -0.08 (-0.2%)
NBP 61.00 Decreased By ▼ -0.05 (-0.08%)
OGDC 193.60 Decreased By ▼ -1.27 (-0.65%)
PAEL 26.88 Decreased By ▼ -0.63 (-2.29%)
PIBTL 7.31 Decreased By ▼ -0.50 (-6.4%)
PPL 152.25 Decreased By ▼ -0.28 (-0.18%)
PRL 26.20 Decreased By ▼ -0.38 (-1.43%)
PTC 16.11 Decreased By ▼ -0.15 (-0.92%)
SEARL 85.50 Increased By ▲ 1.36 (1.62%)
TELE 7.70 Decreased By ▼ -0.26 (-3.27%)
TOMCL 36.95 Increased By ▲ 0.35 (0.96%)
TPLP 8.77 Increased By ▲ 0.11 (1.27%)
TREET 16.80 Decreased By ▼ -0.86 (-4.87%)
TRG 62.20 Increased By ▲ 3.58 (6.11%)
UNITY 28.07 Increased By ▲ 1.21 (4.5%)
WTL 1.32 Decreased By ▼ -0.06 (-4.35%)
BR100 10,081 Increased By 80.6 (0.81%)
BR30 31,142 Increased By 139.8 (0.45%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

An agreement signed on Wednesday between Tuwairqi Steel Mills Limited (TSML) of Al-Tuwairqi Group of Saudi Arabia and the Kawasaki Gas Turbines Asia (KGTA) (a subsidiary of Kawasaki Heavy Industries in Japan) for the supply and erection of a power generating unit at TSML site Bin Qasim Karachi.
The power generating unit of four gas turbines of 6.5 MW capacity each would be sufficient to cater the power requirement of Phase-I of Iron Making (DRI) Plant of 128 million tons per annum capacity.
Kobe Steel of Japan is the original manufacturer and technology supplies of Iron Marking (DRI) Plant. The power-generating unit costing $30 million with combined cycle solution will be of the capacity or around 35-MW. The contract on behalf of Tuwairqi Steel Mills Limited (TSML) was signed by Zaigham Adil Rizvi, Director (Projects) and on behalf of Kawasaki Heavy Industries by Yuji Tanaka, Managing Director of Kawasaki Gas Turbines Asia.
On completion of Phase-I in the next 15 months at a cost around 197 Million $, the Tuwairqi Steel Mills will commence production of 1.28 million tons of iron (DRI) annually.-PR

Copyright Business Recorder, 2007

Comments

Comments are closed.