AGL 40.22 Increased By ▲ 0.22 (0.55%)
AIRLINK 127.00 Decreased By ▼ -0.04 (-0.03%)
BOP 6.61 Decreased By ▼ -0.06 (-0.9%)
CNERGY 4.52 Increased By ▲ 0.01 (0.22%)
DCL 8.54 Decreased By ▼ -0.01 (-0.12%)
DFML 41.65 Increased By ▲ 0.21 (0.51%)
DGKC 87.20 Increased By ▲ 0.35 (0.4%)
FCCL 32.43 Increased By ▲ 0.15 (0.46%)
FFBL 65.40 Increased By ▲ 0.60 (0.93%)
FFL 10.22 Decreased By ▼ -0.03 (-0.29%)
HUBC 109.88 Increased By ▲ 0.31 (0.28%)
HUMNL 14.60 Decreased By ▼ -0.08 (-0.54%)
KEL 5.12 Increased By ▲ 0.07 (1.39%)
KOSM 7.67 Increased By ▲ 0.21 (2.82%)
MLCF 41.65 Increased By ▲ 0.27 (0.65%)
NBP 59.60 Decreased By ▼ -0.81 (-1.34%)
OGDC 194.48 Increased By ▲ 4.38 (2.3%)
PAEL 28.27 Increased By ▲ 0.44 (1.58%)
PIBTL 7.85 Increased By ▲ 0.02 (0.26%)
PPL 152.34 Increased By ▲ 2.28 (1.52%)
PRL 26.59 Decreased By ▼ -0.29 (-1.08%)
PTC 16.05 Decreased By ▼ -0.02 (-0.12%)
SEARL 81.89 Decreased By ▼ -4.11 (-4.78%)
TELE 7.49 Decreased By ▼ -0.22 (-2.85%)
TOMCL 35.49 Increased By ▲ 0.08 (0.23%)
TPLP 8.25 Increased By ▲ 0.13 (1.6%)
TREET 16.16 Decreased By ▼ -0.25 (-1.52%)
TRG 52.73 Decreased By ▼ -0.56 (-1.05%)
UNITY 26.55 Increased By ▲ 0.39 (1.49%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 9,945 Increased By 61.7 (0.62%)
BR30 30,926 Increased By 326.1 (1.07%)
KSE100 93,743 Increased By 387.8 (0.42%)
KSE30 29,049 Increased By 117.6 (0.41%)

Work on the restoration of Chashma hydropower station is nearing completion, and the station will start generating electricity by Thursday evening. The lower floor of the Chashma hydropower station got flooded due to some technical problem in Unit No 3, which was shut down for annual maintenance, according to a Wapda press release issued here on Wednesday.
The said problem resulted in tripping of all six units operating at the time and supplying 87 MW power. Restoration work which was started immediately will be completed on Thursday, and the station will start functioning normally, the release added.

Copyright Associated Press of Pakistan, 2008

Comments

Comments are closed.