AGL 40.18 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.31 Increased By ▲ 0.27 (0.21%)
BOP 6.58 Decreased By ▼ -0.09 (-1.35%)
CNERGY 4.50 Decreased By ▼ -0.01 (-0.22%)
DCL 8.53 Decreased By ▼ -0.02 (-0.23%)
DFML 41.90 Increased By ▲ 0.46 (1.11%)
DGKC 87.60 Increased By ▲ 0.75 (0.86%)
FCCL 32.68 Increased By ▲ 0.40 (1.24%)
FFBL 65.01 Increased By ▲ 0.21 (0.32%)
FFL 10.27 Increased By ▲ 0.02 (0.2%)
HUBC 109.53 Decreased By ▼ -0.04 (-0.04%)
HUMNL 14.60 Decreased By ▼ -0.08 (-0.54%)
KEL 5.12 Increased By ▲ 0.07 (1.39%)
KOSM 7.58 Increased By ▲ 0.12 (1.61%)
MLCF 41.65 Increased By ▲ 0.27 (0.65%)
NBP 59.71 Decreased By ▼ -0.70 (-1.16%)
OGDC 193.85 Increased By ▲ 3.75 (1.97%)
PAEL 28.28 Increased By ▲ 0.45 (1.62%)
PIBTL 7.75 Decreased By ▼ -0.08 (-1.02%)
PPL 151.98 Increased By ▲ 1.92 (1.28%)
PRL 26.50 Decreased By ▼ -0.38 (-1.41%)
PTC 16.11 Increased By ▲ 0.04 (0.25%)
SEARL 84.00 Decreased By ▼ -2.00 (-2.33%)
TELE 7.67 Decreased By ▼ -0.04 (-0.52%)
TOMCL 35.39 Decreased By ▼ -0.02 (-0.06%)
TPLP 8.11 Decreased By ▼ -0.01 (-0.12%)
TREET 16.00 Decreased By ▼ -0.41 (-2.5%)
TRG 52.60 Decreased By ▼ -0.69 (-1.29%)
UNITY 26.31 Increased By ▲ 0.15 (0.57%)
WTL 1.25 Decreased By ▼ -0.01 (-0.79%)
BR100 9,953 Increased By 69.4 (0.7%)
BR30 30,908 Increased By 307.7 (1.01%)
KSE100 93,785 Increased By 429.6 (0.46%)
KSE30 29,050 Increased By 119.3 (0.41%)

Asian Development Bank will provide $150 million for Power Distribution Enhancement Project-1 to Pakistan, which will be implemented by Pakistan Electric Power Company (Pvt.) Limited (Pepco). According to ADB sources, this project will address the capacity shortfalls that currently result in regular system outages and supply interruptions to customers.
This will include (i) addition of circuit and transformer capacity to enable the already overloaded systems to reliably deliver present demand and meet the expected load growth; (ii) loss reduction; and (iii) refurbishment of distribution networks.
ADB is also considering another loan proposal of $810 million MFF - Power Distribution Enhancement to Pakistan. ADB sources stated that this investment programme will enhance the efficiency of the overall power distribution system and provide an adequate and reliable power supply to a greater number of industrial, commercial and residential customers, through funding of investment requirements within each of the eight power distribution companies in Pakistan.
Consulting services will be required for, among others, (i) preparation of sub-projects, (ii) detailed design, and (iii) construction supervision and contract management. Consultants will be selected and engaged in accordance with ADB's guidelines on the Use of Consultants (2007).
Consulting firms will be selected through international competition using the quality- and cost-based selection method. Individual consultants will be recruited for specific assignments in accordance with ADB's procedure. It is envisioned that, because of the continuation of a number of tasks during implementation, single-source selection may be used for certain assignments with the prior approval of ADB.
Procurement will be done in accordance with ADB's Procurement Guidelines (2007). International competitive bidding (ICB) will be used for goods and works. ICB will be utilised for supply contracts estimated to cost the equivalent of or more than $1 million and works contracts estimated to cost the equivalent of more than $5 million.

Copyright Business Recorder, 2008

Comments

Comments are closed.