AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

A representative delegation of Defence Society Residents Associations visited the project site at Beach Avenue DHA here on Monday, where the project consultant gave them an in-depth briefing on the development of a new Storm Water Drainage System in DHA. The project for making a modern drainage system for DHA was initiated after the devastating monsoon rains last year.
A sum of Rs 7.5 million has been earmarked for the phase-I of the project, which will be completed by July 31 before the advent of monsoon season. The entire drainage project would be completed in three-four years while essential infrastructure, which could take rainwater would be completed before the month of July. The work on construction of three main trunk drains (MTDs) on Khayaban-e-Shamsheer, Khayaban-e-Sehar and 'E' street, commenced in December 2007, will be completed before the coming monsoons. The work on three more MTDs, being constructed on Fifth Street and Khayaban-e-Muhaffiz in DHA, will also commence shortly.
Simultaneously the work on upgrading and reinforcement of sewerage system in DHA is also being carried out. The work includes revamping pump stations/pumping machines and cleaning/desilting of sewerage line/manholes. The delegation appreciated the quality of work and design parameters of the project.-PR

Copyright Business Recorder, 2008

Comments

Comments are closed.