AGL 40.40 Increased By ▲ 0.20 (0.5%)
AIRLINK 129.25 Increased By ▲ 0.14 (0.11%)
BOP 6.81 Increased By ▲ 0.21 (3.18%)
CNERGY 4.13 Increased By ▲ 0.10 (2.48%)
DCL 8.73 Increased By ▲ 0.28 (3.31%)
DFML 41.40 Increased By ▲ 0.15 (0.36%)
DGKC 87.75 Increased By ▲ 0.75 (0.86%)
FCCL 33.85 Increased By ▲ 0.50 (1.5%)
FFBL 66.40 Increased By ▲ 0.50 (0.76%)
FFL 10.69 Increased By ▲ 0.15 (1.42%)
HUBC 113.51 Increased By ▲ 2.81 (2.54%)
HUMNL 15.65 Increased By ▲ 0.42 (2.76%)
KEL 4.87 Increased By ▲ 0.09 (1.88%)
KOSM 7.62 Decreased By ▼ -0.21 (-2.68%)
MLCF 43.10 Increased By ▲ 1.20 (2.86%)
NBP 61.50 Increased By ▲ 1.00 (1.65%)
OGDC 192.20 Increased By ▲ 9.40 (5.14%)
PAEL 27.05 Increased By ▲ 1.69 (6.66%)
PIBTL 7.26 Increased By ▲ 1.00 (15.97%)
PPL 150.50 Increased By ▲ 2.69 (1.82%)
PRL 24.96 Increased By ▲ 0.40 (1.63%)
PTC 16.25 Increased By ▲ 0.01 (0.06%)
SEARL 71.30 Increased By ▲ 0.80 (1.13%)
TELE 7.25 Decreased By ▼ -0.05 (-0.68%)
TOMCL 36.29 Decreased By ▼ -0.01 (-0.03%)
TPLP 8.05 Increased By ▲ 0.20 (2.55%)
TREET 16.30 Increased By ▲ 1.00 (6.54%)
TRG 51.56 Decreased By ▼ -0.14 (-0.27%)
UNITY 27.35 No Change ▼ 0.00 (0%)
WTL 1.27 Increased By ▲ 0.04 (3.25%)
BR100 9,967 Increased By 125.2 (1.27%)
BR30 30,751 Increased By 714.7 (2.38%)
KSE100 93,292 Increased By 771.2 (0.83%)
KSE30 29,017 Increased By 230.5 (0.8%)

The hardware and the software components of the Telemetry System are capable of providing data equivalent to the existing manual system. The system does "work", and is also capable of satisfying its purpose of independently monitoring the flows through the Indus Basin Irrigation System.
This is the conclusion, drawn by the World Bank Consultant on Telemetry Project for Indus Basin Irrigation System, Ian Maclaurin, in his appraisal report. However, at some sites and locations, the Telemetry System requires minor adjustments and corrections.
The World Bank Consultant, during a presentation to the Ministry of Water and Power, also declared that the Telemetry System was delivered as requested by the Irsa in PC-1 and is able to respond to the issues that initiated it. The equipment, the technology, and the system are adequate to the task. He has declared the Telemetry System as "fully operational".
He has suggested formation of two working groups to build confidence of all the stakeholders on the Telemetry System by addressing the concerns and day-to-day technical issues. These working groups are fully functional. The Telemetry Project for Indus Basin Irrigation System, being operated and maintained by Wapda, is fully functional round-the-clock, and its data can be viewed on the website.

Copyright Business Recorder, 2008

Comments

Comments are closed.