AGL 39.75 Decreased By ▼ -0.25 (-0.63%)
AIRLINK 129.00 Decreased By ▼ -0.06 (-0.05%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.69 Increased By ▲ 0.20 (4.45%)
DCL 8.45 Decreased By ▼ -0.10 (-1.17%)
DFML 41.19 Increased By ▲ 0.37 (0.91%)
DGKC 83.10 Increased By ▲ 2.14 (2.64%)
FCCL 33.14 Increased By ▲ 0.37 (1.13%)
FFBL 73.71 Decreased By ▼ -0.72 (-0.97%)
FFL 11.90 Increased By ▲ 0.16 (1.36%)
HUBC 110.75 Increased By ▲ 1.17 (1.07%)
HUMNL 14.65 Increased By ▲ 0.90 (6.55%)
KEL 5.23 Decreased By ▼ -0.08 (-1.51%)
KOSM 7.65 Decreased By ▼ -0.07 (-0.91%)
MLCF 39.01 Increased By ▲ 0.41 (1.06%)
NBP 63.90 Increased By ▲ 0.39 (0.61%)
OGDC 194.75 Increased By ▲ 0.06 (0.03%)
PAEL 25.80 Increased By ▲ 0.09 (0.35%)
PIBTL 7.31 Decreased By ▼ -0.08 (-1.08%)
PPL 155.00 Decreased By ▼ -0.45 (-0.29%)
PRL 25.95 Increased By ▲ 0.16 (0.62%)
PTC 17.75 Increased By ▲ 0.25 (1.43%)
SEARL 82.00 Increased By ▲ 3.35 (4.26%)
TELE 7.65 Decreased By ▼ -0.21 (-2.67%)
TOMCL 33.48 Decreased By ▼ -0.25 (-0.74%)
TPLP 8.53 Increased By ▲ 0.13 (1.55%)
TREET 16.50 Increased By ▲ 0.23 (1.41%)
TRG 56.88 Decreased By ▼ -1.34 (-2.3%)
UNITY 27.65 Increased By ▲ 0.16 (0.58%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,540 Increased By 94.7 (0.91%)
BR30 31,313 Increased By 123.7 (0.4%)
KSE100 98,375 Increased By 576.9 (0.59%)
KSE30 30,689 Increased By 207.8 (0.68%)

The hardware and the software components of the Telemetry System are capable of providing data equivalent to the existing manual system. The system does "work", and is also capable of satisfying its purpose of independently monitoring the flows through the Indus Basin Irrigation System.
This is the conclusion, drawn by the World Bank Consultant on Telemetry Project for Indus Basin Irrigation System, Ian Maclaurin, in his appraisal report. However, at some sites and locations, the Telemetry System requires minor adjustments and corrections.
The World Bank Consultant, during a presentation to the Ministry of Water and Power, also declared that the Telemetry System was delivered as requested by the Irsa in PC-1 and is able to respond to the issues that initiated it. The equipment, the technology, and the system are adequate to the task. He has declared the Telemetry System as "fully operational".
He has suggested formation of two working groups to build confidence of all the stakeholders on the Telemetry System by addressing the concerns and day-to-day technical issues. These working groups are fully functional. The Telemetry Project for Indus Basin Irrigation System, being operated and maintained by Wapda, is fully functional round-the-clock, and its data can be viewed on the website.

Copyright Business Recorder, 2008

Comments

Comments are closed.