AGL 40.02 Decreased By ▼ -0.01 (-0.02%)
AIRLINK 127.99 Increased By ▲ 0.29 (0.23%)
BOP 6.66 Increased By ▲ 0.05 (0.76%)
CNERGY 4.44 Decreased By ▼ -0.16 (-3.48%)
DCL 8.75 Decreased By ▼ -0.04 (-0.46%)
DFML 41.24 Decreased By ▼ -0.34 (-0.82%)
DGKC 86.18 Increased By ▲ 0.39 (0.45%)
FCCL 32.40 Decreased By ▼ -0.09 (-0.28%)
FFBL 64.89 Increased By ▲ 0.86 (1.34%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.51 Increased By ▲ 1.74 (1.57%)
HUMNL 14.75 Decreased By ▼ -0.32 (-2.12%)
KEL 5.08 Increased By ▲ 0.20 (4.1%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.44 Decreased By ▼ -0.08 (-0.2%)
NBP 61.00 Decreased By ▼ -0.05 (-0.08%)
OGDC 193.60 Decreased By ▼ -1.27 (-0.65%)
PAEL 26.88 Decreased By ▼ -0.63 (-2.29%)
PIBTL 7.31 Decreased By ▼ -0.50 (-6.4%)
PPL 152.25 Decreased By ▼ -0.28 (-0.18%)
PRL 26.20 Decreased By ▼ -0.38 (-1.43%)
PTC 16.11 Decreased By ▼ -0.15 (-0.92%)
SEARL 85.50 Increased By ▲ 1.36 (1.62%)
TELE 7.70 Decreased By ▼ -0.26 (-3.27%)
TOMCL 36.95 Increased By ▲ 0.35 (0.96%)
TPLP 8.77 Increased By ▲ 0.11 (1.27%)
TREET 16.80 Decreased By ▼ -0.86 (-4.87%)
TRG 62.20 Increased By ▲ 3.58 (6.11%)
UNITY 28.07 Increased By ▲ 1.21 (4.5%)
WTL 1.32 Decreased By ▼ -0.06 (-4.35%)
BR100 10,081 Increased By 80.6 (0.81%)
BR30 31,142 Increased By 139.8 (0.45%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

Capital Development Authority (CDA) would set-up a transport terminal in sector I-18, around 40 km away from the center of the city, it was learnt on Sunday.
"The terminal would comprise a railway station, bus station and a dry port," a CDA official said, adding that it would be linked to Rawalpindi through a rail track from sector I-18 to Saddar via Loi Bher.
The official said the Authority has conducted a survey to identify suitable site for the project but any decision in this regard would be made after the final approval of the revised Master Plan of the capital city.
The Authority in co-ordination with the Railways Ministry would prepare a commercial and technical feasibility report on the construction of railway station. The ministry would handle technical details while CDA would monitor the execution of the project.
He said there was need to construct a new railway station as the old Margala Railway Station in sector I-9 was no more functional. In the past a weekly train service 'Ghandhara Steam' was operated from Rawalpindi Railway Station to Golra Station, which became dysfunctional and now serves as a mini railway museum.
The new terminal would be linked with the Capital City through a railway track and added that the existing track would also be extended from I-9 sector to the terminal.
A modern dry port would also be a part of the project. The new dry port will not only serve the traders of Islamabad and Rawalpindi but the trading community of Hattar, Taxila, Akora Khattak and Azad Kashmir will also benefit from this port.
The port would be equipped with all the modern facilities including stuffing and de-stuffing of containers, facility for direct transmission of data from sea ports to dry port, Internet and fax. Electronic Weigh Bridge is also proposed to be provided, the official said. A bus station would also be set up in the sector, which would be as vast as to accommodate hundreds of the buses to be plied between twin cities and other cities. The bus station would be facilitated with the modern facilities including proper parking places, waiting room, and offices.

Copyright Associated Press of Pakistan, 2008

Comments

Comments are closed.