AIRLINK 192.46 Decreased By ▼ -3.92 (-2%)
BOP 10.23 Increased By ▲ 0.12 (1.19%)
CNERGY 7.53 Decreased By ▼ -0.22 (-2.84%)
FCCL 38.10 No Change ▼ 0.00 (0%)
FFL 15.41 Decreased By ▼ -0.33 (-2.1%)
FLYNG 24.82 Increased By ▲ 0.28 (1.14%)
HUBC 128.08 Decreased By ▼ -2.30 (-1.76%)
HUMNL 13.77 Increased By ▲ 0.04 (0.29%)
KEL 4.44 Decreased By ▼ -0.16 (-3.48%)
KOSM 6.21 Increased By ▲ 0.02 (0.32%)
MLCF 44.62 Decreased By ▼ -0.23 (-0.51%)
OGDC 202.69 Decreased By ▼ -3.82 (-1.85%)
PACE 6.63 Increased By ▲ 0.05 (0.76%)
PAEL 37.95 Decreased By ▼ -1.82 (-4.58%)
PIAHCLA 17.01 Decreased By ▼ -0.19 (-1.1%)
PIBTL 7.84 Decreased By ▼ -0.15 (-1.88%)
POWER 9.40 Increased By ▲ 0.20 (2.17%)
PPL 175.05 Decreased By ▼ -3.86 (-2.16%)
PRL 37.34 Decreased By ▼ -1.59 (-4.08%)
PTC 23.45 Decreased By ▼ -0.86 (-3.54%)
SEARL 104.89 Decreased By ▼ -4.38 (-4.01%)
SILK 1.01 Increased By ▲ 0.01 (1%)
SSGC 36.90 Decreased By ▼ -0.85 (-2.25%)
SYM 18.26 Decreased By ▼ -0.57 (-3.03%)
TELE 8.27 Decreased By ▼ -0.26 (-3.05%)
TPLP 12.13 Decreased By ▼ -0.01 (-0.08%)
TRG 63.98 Decreased By ▼ -0.78 (-1.2%)
WAVESAPP 11.72 Decreased By ▼ -0.39 (-3.22%)
WTL 1.63 Decreased By ▼ -0.01 (-0.61%)
YOUW 3.89 Increased By ▲ 0.02 (0.52%)
BR100 11,856 Decreased By -143.8 (-1.2%)
BR30 34,973 Decreased By -575 (-1.62%)
KSE100 112,745 Decreased By -1510.7 (-1.32%)
KSE30 35,360 Decreased By -509.9 (-1.42%)

A Rs 4.1 billion agreement for consultancy services for Neelum-Jhelum Hydroelectric Project (NJHEP) was signed between Wapda and Neelum-Jhelum Consultants, a joint venture of two foreign and three local firms, here at Wapda House on Thursday.
General Manager, NJHEP, Husnain Afzal and Gene J Kocian signed the agreement on behalf of Wapda and Neelum-Jhelum Consultants respectively. Wapda Chairman, Shakil Durrani and Member (Water) Syed Raghib Abbas Shah also witnessed the ceremony.
Speaking on the occasion, Wapda Chairman said that the 969 MW Neelum-Jhelum Hydroelectric Project would be completed in seven years with a total cost of Rs 130 billion and contribute more than 5 billion units of electricity annually to the national grid.
He said that the project would help improve the ratio of hydel electricity in the total generation system of the country. Per unit electricity, generated by the project, will cost only Rs 1.92, which is about three times less than that of the thermal generation. While thanking the AJK Government, the Chairman revealed that the land for the project has already been acquired.
Dilating upon the future hydropower projects of Wapda, the Chairman said that detailed engineering designs of various hydropower projects with accumulative generation capacity of 25,000 MW are presently at the advance stages.

Copyright Associated Press of Pakistan, 2008

Comments

Comments are closed.