AIRLINK 204.45 Increased By ▲ 3.55 (1.77%)
BOP 10.09 Decreased By ▼ -0.06 (-0.59%)
CNERGY 6.91 Increased By ▲ 0.03 (0.44%)
FCCL 34.83 Increased By ▲ 0.74 (2.17%)
FFL 17.21 Increased By ▲ 0.23 (1.35%)
FLYNG 24.52 Increased By ▲ 0.48 (2%)
HUBC 137.40 Increased By ▲ 5.70 (4.33%)
HUMNL 13.82 Increased By ▲ 0.06 (0.44%)
KEL 4.91 Increased By ▲ 0.10 (2.08%)
KOSM 6.70 No Change ▼ 0.00 (0%)
MLCF 44.31 Increased By ▲ 0.98 (2.26%)
OGDC 221.91 Increased By ▲ 3.16 (1.44%)
PACE 7.09 Increased By ▲ 0.11 (1.58%)
PAEL 42.97 Increased By ▲ 1.43 (3.44%)
PIAHCLA 17.08 Increased By ▲ 0.01 (0.06%)
PIBTL 8.59 Decreased By ▼ -0.06 (-0.69%)
POWER 9.02 Decreased By ▼ -0.09 (-0.99%)
PPL 190.60 Increased By ▲ 3.48 (1.86%)
PRL 43.04 Increased By ▲ 0.98 (2.33%)
PTC 25.04 Increased By ▲ 0.05 (0.2%)
SEARL 106.41 Increased By ▲ 6.11 (6.09%)
SILK 1.02 Increased By ▲ 0.01 (0.99%)
SSGC 42.91 Increased By ▲ 0.58 (1.37%)
SYM 18.31 Increased By ▲ 0.33 (1.84%)
TELE 9.14 Increased By ▲ 0.03 (0.33%)
TPLP 13.11 Increased By ▲ 0.18 (1.39%)
TRG 68.13 Decreased By ▼ -0.22 (-0.32%)
WAVESAPP 10.24 Decreased By ▼ -0.05 (-0.49%)
WTL 1.87 Increased By ▲ 0.01 (0.54%)
YOUW 4.09 Decreased By ▼ -0.04 (-0.97%)
BR100 12,137 Increased By 188.4 (1.58%)
BR30 37,146 Increased By 778.3 (2.14%)
KSE100 115,272 Increased By 1435.3 (1.26%)
KSE30 36,311 Increased By 549.3 (1.54%)

The Punjab government has allocated Rs 11.30 billion for the Irrigation sector in the budget 2008-09. This shows an increase of around 3 percent over the allocations made for the 2007-08 fiscal and constitute about 11.2 percent of the core Annual Development Programme (ADP) (2008-09) budget under the mid term development framework MTDF 2008-11.
Out of the total 103 schemes included in (MTDF) 2008-09, 60 schemes comprising 47 ongoing and 13 new have been targeted for completion by allocating 73 percent of outlay to the on-going and 27 percent to new schemes. Irrigated agriculture is the major determinant of economic growth potential of the province as it accounts for 26 percent of the GDP and caters for over 40 percent of the province work force.
Over 90 percent of agricultural output in Punjab come from farmlands irrigated by one of the largest contiguous irrigation systems in the world. The colossal irrigation conveyance network is serving 21 million acres (8.4 million-hectare) cultivable command area with cropping intensities generally exceeding 120 percent. The vast irrigation system in the province, however, faces major irrigation and drainage challenges with serious economic, environmental and social implications.
Hydraulic infrastructure has deteriorated and large deficits in O&M maintenance have led to sub-optimal service delivery levels characterised by low water conveyance efficiencies and inequitable water deliveries. Consequently, development in the sector needs to encompass holistic reform aimed at integrity and sustainability of irrigation infrastructure through improved irrigation management and service delivery levels.

Copyright Business Recorder, 2008

Comments

Comments are closed.