AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,684 Increased By 595 (5.9%)
BR30 31,445 Increased By 1935.9 (6.56%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

A pilot project costing 5 million dollar to produce 486 meters cubic feet of bio-gas and 25 kilowatts of electricity per day from cow-dung has been commissioned in Landhi Cattle Colony. British company HiRAD Technology Plc, UK has installed this plant as a pilot project to utilise cow-dung and convert it into bio-gas and electricity.
Besides producing 2.25 tons of enriched natural manure (organic fertiliser) per day. The formal inauguration ceremony of the pilot project will be held after the successful results of the commissioning, sources said here on Friday. They said that cow-dung will not be discharged into the sea as has been done at present and instead this waste would be used to produce bio-gas, electricity and manure.
He said that after the successful experiment, a large plant with a capacity of producing 30 megawatts of electricity, 0.430 million cubic meters of bio gas and 1,500 tons of manure per day will be installed in Cattle Colony. The cost of the large plant is estimated in the range of 110 million dollar to 120 million dollar and leading multinational companies besides Asian Development Bank (ADB) have already shown their keen interest to invest in this project.

Copyright Associated Press of Pakistan, 2008

Comments

Comments are closed.