AIRLINK 189.64 Decreased By ▼ -7.01 (-3.56%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.68 Decreased By ▼ -0.01 (-0.15%)
FCCL 34.14 Increased By ▲ 1.12 (3.39%)
FFL 17.09 Increased By ▲ 0.44 (2.64%)
FLYNG 23.83 Increased By ▲ 1.38 (6.15%)
HUBC 126.05 Decreased By ▼ -1.24 (-0.97%)
HUMNL 13.79 Decreased By ▼ -0.11 (-0.79%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.58 Increased By ▲ 0.21 (3.3%)
MLCF 43.28 Increased By ▲ 1.06 (2.51%)
OGDC 224.96 Increased By ▲ 11.93 (5.6%)
PACE 7.38 Increased By ▲ 0.37 (5.28%)
PAEL 41.74 Increased By ▲ 0.87 (2.13%)
PIAHCLA 17.19 Increased By ▲ 0.37 (2.2%)
PIBTL 8.41 Increased By ▲ 0.12 (1.45%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 193.09 Increased By ▲ 9.52 (5.19%)
PRL 37.34 Decreased By ▼ -0.93 (-2.43%)
PTC 24.02 Decreased By ▼ -0.05 (-0.21%)
SEARL 94.54 Decreased By ▼ -0.57 (-0.6%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.93 Decreased By ▼ -0.38 (-0.94%)
SYM 17.77 Decreased By ▼ -0.44 (-2.42%)
TELE 8.66 Decreased By ▼ -0.07 (-0.8%)
TPLP 12.39 Increased By ▲ 0.18 (1.47%)
TRG 62.65 Decreased By ▼ -1.71 (-2.66%)
WAVESAPP 10.28 Decreased By ▼ -0.16 (-1.53%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
YOUW 3.97 Decreased By ▼ -0.03 (-0.75%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

The Director Manpower Training Sindh has informed that nine different development schemes have been taken into hand at the total cost of Rs 892.799 million while other two other schemes have been conceived at a cost of Rs 161.070 million which are yet to be got approved from the competent authority for the skill development of youths enabling them to earn their livelihood without difficulties.
In his departmental progress report, he said that in addition to one new scheme "Benazir Bhutto Shaheed Youth Development Progamme" launched at a cost of Rs 482.339 million by Labour Department, eight other development schemes have also been taken into hand costing Rs 410.460 million.
He said that these schemes including repair and rehabilitation of building and introduction of new trades at Technical Training Centre Sukkur has been taken into hand costing Rs 7.771 million, construction of building and provision of machinery/equipment for existing Trades at Technical Training Centre Latifabad-Hyderabad (Rs 23.200 million), construction of Annexe addition/renovation of the building of the Directorate of Manpower and Training Sindh Karachi (Rs 22.050 million), establishment of New Technical Training Centre and construction of building consideration and improvement of existing Technical Training Centres including Staff residences in Sindh (Rs 33.191 million), construction of building for Employment Exchange in Sindh (Phase-I) (Rs 50.081 million), establishment of Vocational Training Centre for Boys/Girls at Northern Bypass Sindh Small Industrial Estate Karachi (Rs 39.629 million), Vocational and skilled training for rehabilitation of prisoners in Sindh (Rs 166.635 million), and the scheme for Technical/Vocational Training Programme for Employment of youths in Sindh was being implemented (Rs 67.903 million).
He said that PC-I of two other schemes including establishment of Technical Training Centre Mithi for training skilled workers required for coal mining in Thar at the cost of Rs 40.00 million, and the construction of building and provision of latest equipment for existing seven youth vocational centres in Sindh at the cost of Rs 121.070 million have been completed and same were yet to be got approved while PC-I of establishment of Technical Education and Vocational Training Centre Bhira City District Nausheor-feroze at its estimated cost of Rs 67.903 million, and the PC-I of one other scheme for establishment of Skill Development Centre for Oil and Gas Technologies at Sukkur was under preparation.

Copyright Business Recorder, 2009

Comments

Comments are closed.