AIRLINK 197.97 Decreased By ▼ -3.27 (-1.62%)
BOP 10.04 Increased By ▲ 0.07 (0.7%)
CNERGY 7.29 Increased By ▲ 0.40 (5.81%)
FCCL 36.00 Increased By ▲ 0.64 (1.81%)
FFL 16.91 Decreased By ▼ -0.24 (-1.4%)
FLYNG 25.04 Increased By ▲ 0.83 (3.43%)
HUBC 134.03 Decreased By ▼ -4.16 (-3.01%)
HUMNL 14.14 Increased By ▲ 0.07 (0.5%)
KEL 4.78 Decreased By ▼ -0.08 (-1.65%)
KOSM 6.94 Increased By ▲ 0.28 (4.2%)
MLCF 44.98 Decreased By ▼ -1.33 (-2.87%)
OGDC 218.23 Decreased By ▼ -4.31 (-1.94%)
PACE 6.94 Decreased By ▼ -0.12 (-1.7%)
PAEL 41.42 Decreased By ▼ -1.72 (-3.99%)
PIAHCLA 16.86 Decreased By ▼ -0.17 (-1%)
PIBTL 8.46 Decreased By ▼ -0.08 (-0.94%)
POWER 9.39 Increased By ▲ 0.29 (3.19%)
PPL 185.93 Decreased By ▼ -2.83 (-1.5%)
PRL 41.27 Decreased By ▼ -2.00 (-4.62%)
PTC 24.77 Decreased By ▼ -0.58 (-2.29%)
SEARL 104.65 Decreased By ▼ -5.77 (-5.23%)
SILK 1.01 Decreased By ▼ -0.02 (-1.94%)
SSGC 40.91 Decreased By ▼ -1.73 (-4.06%)
SYM 18.05 Decreased By ▼ -0.52 (-2.8%)
TELE 8.91 Decreased By ▼ -0.21 (-2.3%)
TPLP 12.84 Decreased By ▼ -0.84 (-6.14%)
TRG 66.60 Decreased By ▼ -1.56 (-2.29%)
WAVESAPP 11.30 Increased By ▲ 1.03 (10.03%)
WTL 1.78 Decreased By ▼ -0.09 (-4.81%)
YOUW 4.00 Decreased By ▼ -0.01 (-0.25%)
BR100 12,109 Decreased By -110.5 (-0.9%)
BR30 36,598 Decreased By -719.6 (-1.93%)
KSE100 115,042 Decreased By -802.6 (-0.69%)
KSE30 36,200 Decreased By -276.6 (-0.76%)

NEW YORK: Shell's Nigerian subsidiary has shut its 180,000 barrel-per-day Trans Niger pipeline in Nigeria due to a leak, the company said in a statement on Monday, effectively shutting in exports of Bonny Light crude oil.

The Shell Petroleum Development Company (SPDC) said it shut the pipeline on July 21 after a leak at B-Dere, Ogoniland. The company said it did not yet know the cause of the leak.

Shell declared force majeure on Bonny Light exports earlier this month after the closure of the Nembe Creek Trunk Line by operator Aiteo, the only other export avenue, but until last week loadings continued via the Trans Niger Pipeline.

August exports of Bonny Light had originally been planned at more than 200,000 bpd.

SPDC said efforts are ongoing for a joint investigation visit to determine the cause of the leak and repair of the pipeline.

 

Copyright Reuters, 2017

Comments

Comments are closed.