AIRLINK 197.00 Decreased By ▼ -4.24 (-2.11%)
BOP 10.02 Increased By ▲ 0.05 (0.5%)
CNERGY 7.33 Increased By ▲ 0.44 (6.39%)
FCCL 35.70 Increased By ▲ 0.34 (0.96%)
FFL 16.94 Decreased By ▼ -0.21 (-1.22%)
FLYNG 25.20 Increased By ▲ 0.99 (4.09%)
HUBC 134.00 Decreased By ▼ -4.19 (-3.03%)
HUMNL 14.03 Decreased By ▼ -0.04 (-0.28%)
KEL 4.80 Decreased By ▼ -0.06 (-1.23%)
KOSM 6.88 Increased By ▲ 0.22 (3.3%)
MLCF 44.50 Decreased By ▼ -1.81 (-3.91%)
OGDC 217.99 Decreased By ▼ -4.55 (-2.04%)
PACE 6.95 Decreased By ▼ -0.11 (-1.56%)
PAEL 41.00 Decreased By ▼ -2.14 (-4.96%)
PIAHCLA 16.85 Decreased By ▼ -0.18 (-1.06%)
PIBTL 8.45 Decreased By ▼ -0.09 (-1.05%)
POWER 9.35 Increased By ▲ 0.25 (2.75%)
PPL 184.03 Decreased By ▼ -4.73 (-2.51%)
PRL 40.75 Decreased By ▼ -2.52 (-5.82%)
PTC 24.75 Decreased By ▼ -0.60 (-2.37%)
SEARL 103.40 Decreased By ▼ -7.02 (-6.36%)
SILK 1.01 Decreased By ▼ -0.02 (-1.94%)
SSGC 40.48 Decreased By ▼ -2.16 (-5.07%)
SYM 18.00 Decreased By ▼ -0.57 (-3.07%)
TELE 8.80 Decreased By ▼ -0.32 (-3.51%)
TPLP 12.75 Decreased By ▼ -0.93 (-6.8%)
TRG 66.80 Decreased By ▼ -1.36 (-2%)
WAVESAPP 11.30 Increased By ▲ 1.03 (10.03%)
WTL 1.78 Decreased By ▼ -0.09 (-4.81%)
YOUW 4.03 Increased By ▲ 0.02 (0.5%)
BR100 12,077 Decreased By -142.4 (-1.17%)
BR30 36,524 Decreased By -793.3 (-2.13%)
KSE100 115,042 Decreased By -802.6 (-0.69%)
KSE30 36,200 Decreased By -276.6 (-0.76%)

NASA delayed a Wednesday morning lift-off of the space shuttle Discovery because of an apparent problem with a valve in its fuel tank and said the next possible launch opportunity was Friday. It was the second consecutive delay, after stormy weather postponed a launch attempt early on Tuesday.
Discovery and its seven-member crew were preparing for a 13-day supply mission to the International Space Station. The valve problem surfaced as technicians began fuelling up the shuttle for a launch set for 1:10 am EDT (0510 GMT) from the Kennedy Space Center in Florida.
"When we went to close the valve (after the hydrogen tank was full) we didn't get an indication that it was closed," Mike Moses, who oversees the shuttle program at the launch site, told reporters. Engineers believe the problem to be with instrumentation that monitors the valve, and not the valve itself, which would position NASA for a possible third launch attempt at 12:22 am EDT (0422 GMT) on Friday.

Copyright Reuters, 2009

Comments

Comments are closed.