AGL 36.58 Decreased By ▼ -1.42 (-3.74%)
AIRLINK 215.74 Increased By ▲ 1.83 (0.86%)
BOP 9.48 Increased By ▲ 0.06 (0.64%)
CNERGY 6.52 Increased By ▲ 0.23 (3.66%)
DCL 8.61 Decreased By ▼ -0.16 (-1.82%)
DFML 41.04 Decreased By ▼ -1.17 (-2.77%)
DGKC 98.98 Increased By ▲ 4.86 (5.16%)
FCCL 36.34 Increased By ▲ 1.15 (3.27%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 17.08 Increased By ▲ 0.69 (4.21%)
HUBC 126.34 Decreased By ▼ -0.56 (-0.44%)
HUMNL 13.44 Increased By ▲ 0.07 (0.52%)
KEL 5.23 Decreased By ▼ -0.08 (-1.51%)
KOSM 6.83 Decreased By ▼ -0.11 (-1.59%)
MLCF 44.10 Increased By ▲ 1.12 (2.61%)
NBP 59.69 Increased By ▲ 0.84 (1.43%)
OGDC 221.10 Increased By ▲ 1.68 (0.77%)
PAEL 40.53 Increased By ▲ 1.37 (3.5%)
PIBTL 8.08 Decreased By ▼ -0.10 (-1.22%)
PPL 191.53 Decreased By ▼ -0.13 (-0.07%)
PRL 38.55 Increased By ▲ 0.63 (1.66%)
PTC 27.00 Increased By ▲ 0.66 (2.51%)
SEARL 104.33 Increased By ▲ 0.33 (0.32%)
TELE 8.63 Increased By ▲ 0.24 (2.86%)
TOMCL 34.96 Increased By ▲ 0.21 (0.6%)
TPLP 13.70 Increased By ▲ 0.82 (6.37%)
TREET 24.89 Decreased By ▼ -0.45 (-1.78%)
TRG 73.55 Increased By ▲ 3.10 (4.4%)
UNITY 33.27 Decreased By ▼ -0.12 (-0.36%)
WTL 1.71 Decreased By ▼ -0.01 (-0.58%)
BR100 11,987 Increased By 93.1 (0.78%)
BR30 37,178 Increased By 323.2 (0.88%)
KSE100 111,351 Increased By 927.9 (0.84%)
KSE30 35,039 Increased By 261 (0.75%)

The First Block-52 F-16D aircraft of Pakistan Air Force (PAF) rolled out on Tuesday at a ceremony held at Lockheed Martin Aeronautics (LM Aero) facility at Dallas - Fort Worth, Texas USA. An ISPR (PAF) press release issued here on Tuesday evening said that the Air Chief Marshal Rao Qamar Suleman, Chief of the Air Staff, Pakistan Air Force, attended the ceremony as the chief guest.
It said that Pakistan had signed a contract with US government in September 2006 for supply of 18 Block-52 F-16 C/D aircraft from M/s LM Aero. These state-of-the-art F-16s will bolster PAF's fleet of high tech combat aircraft and will enable it to undertake wide variety of missions across the entire spectrum of operations.
After completion of testing and integration of the new system, the first batch of F-16 C/D aircraft is scheduled to arrive in Pakistan in June 2010, and the delivery of all 18 F-16s is planned to complete by December 2010. Speaking on the occasion, ACM Rao Qamar Suleman said that this programme has seen many ups and downs since signing of the contract.
The rollout of the first aircraft shows that the programme is on track. Besides CAS PAF, the ceremony was also attended by Ms Kay Granger (Member US House of Representatives), General Norton Schwartz (Chief of Staff USAF), General David H Petraeus, Commander CENTCOM, Hussain Haqqani (Ambassador of Pakistan to the US), Ralph Heath (President LM Aero), John Larson (VP F-16/F-2/T-50 Programmes) and other distinguished guests from the US Government, LM Aero and the Government of Pakistan.

Copyright Associated Press of Pakistan, 2009

Comments

Comments are closed.