AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)
Pakistan

No more load-shedding in country by end of this year: Aid Sher Ali

ISLAMABAD: State Minister for Power Abid Sher Ali on Monday said that efforts were underway for improvement in power
Published September 18, 2017

ISLAMABAD: State Minister for Power Abid Sher Ali on Monday said that efforts were underway for improvement in power sector and load shedding would end in the country by 2017.

He stated this while addressing the Senate following a motion under Rule 218 regarding structural issues of power sector in the country resulting into perpetual crisis affecting the daily lives of general public.

The minister said that performance of power distribution companies has been improved and recovery in power sector has increased.

He said that line losses have been decreased while 6000-7000 MW electricity has been added into the current power distribution system.

Following directions of Prime Minister, he said that all oil based power generating plants would be converted on gas and load shedding would end by 2017.

He further stated that power infrastructure was being upgraded throughout the country including Khyber Pakhtunkhwa. Grid stations were being set up at Chakdara, Nowshera and Dera Ismail Khan to ensure uninterrupted power supply, he maintained.

Copyright APP (Associated Press of Pakistan), 2017

Comments

Comments are closed.