AGL 40.40 Increased By ▲ 0.20 (0.5%)
AIRLINK 129.25 Increased By ▲ 0.14 (0.11%)
BOP 6.81 Increased By ▲ 0.21 (3.18%)
CNERGY 4.13 Increased By ▲ 0.10 (2.48%)
DCL 8.73 Increased By ▲ 0.28 (3.31%)
DFML 41.40 Increased By ▲ 0.15 (0.36%)
DGKC 87.75 Increased By ▲ 0.75 (0.86%)
FCCL 33.85 Increased By ▲ 0.50 (1.5%)
FFBL 66.40 Increased By ▲ 0.50 (0.76%)
FFL 10.69 Increased By ▲ 0.15 (1.42%)
HUBC 113.51 Increased By ▲ 2.81 (2.54%)
HUMNL 15.65 Increased By ▲ 0.42 (2.76%)
KEL 4.87 Increased By ▲ 0.09 (1.88%)
KOSM 7.62 Decreased By ▼ -0.21 (-2.68%)
MLCF 43.10 Increased By ▲ 1.20 (2.86%)
NBP 61.50 Increased By ▲ 1.00 (1.65%)
OGDC 192.20 Increased By ▲ 9.40 (5.14%)
PAEL 27.05 Increased By ▲ 1.69 (6.66%)
PIBTL 7.26 Increased By ▲ 1.00 (15.97%)
PPL 150.50 Increased By ▲ 2.69 (1.82%)
PRL 24.96 Increased By ▲ 0.40 (1.63%)
PTC 16.25 Increased By ▲ 0.01 (0.06%)
SEARL 71.30 Increased By ▲ 0.80 (1.13%)
TELE 7.25 Decreased By ▼ -0.05 (-0.68%)
TOMCL 36.29 Decreased By ▼ -0.01 (-0.03%)
TPLP 8.05 Increased By ▲ 0.20 (2.55%)
TREET 16.30 Increased By ▲ 1.00 (6.54%)
TRG 51.56 Decreased By ▼ -0.14 (-0.27%)
UNITY 27.35 No Change ▼ 0.00 (0%)
WTL 1.27 Increased By ▲ 0.04 (3.25%)
BR100 9,967 Increased By 125.2 (1.27%)
BR30 30,751 Increased By 714.7 (2.38%)
KSE100 93,292 Increased By 771.2 (0.83%)
KSE30 29,017 Increased By 230.5 (0.8%)

A joint venture between Saudi Arabia and Kuwait has extended the bidding deadline for two projects at al-Khafji oilfield to December 28, bidders said on Saturday. The original deadline for both contracts was September 28, but has been extended several times at the request of bidders.
The two projects cover expansion of offshore oil facilities and construction of water treatment facilities at the oilfield. Khafji, which is in the Neutral Zone between the two countries, has oil production capacity of around 550,000 bpd. The kingdom and Kuwait plan to boost capacity in the zone to 700,000-900,000 bpd by 2030.
The al-Khafji Joint Operations Company (KJO) has also extended a bidding deadline to updgrade onshore crude facilities, which include a crude and gas treatment plant at its Hout field to February 8 from December 28, two contractors said. The offshore crude project, which aims to raise production from Khafji, mainly provides for the installation of new power distribution platforms, submarine power cables and well jackets. For the onshore water treatment facilities, contractors will have to overhaul an existing plant and build a new one.

Copyright Reuters, 2009

Comments

Comments are closed.