AIRLINK 194.83 Decreased By ▼ -3.14 (-1.59%)
BOP 9.81 Decreased By ▼ -0.23 (-2.29%)
CNERGY 7.36 Increased By ▲ 0.07 (0.96%)
FCCL 38.58 Increased By ▲ 2.58 (7.17%)
FFL 16.45 Decreased By ▼ -0.46 (-2.72%)
FLYNG 27.54 Increased By ▲ 2.50 (9.98%)
HUBC 131.75 Decreased By ▼ -2.28 (-1.7%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.66 Decreased By ▼ -0.12 (-2.51%)
KOSM 6.66 Decreased By ▼ -0.28 (-4.03%)
MLCF 45.39 Increased By ▲ 0.41 (0.91%)
OGDC 213.99 Decreased By ▼ -4.24 (-1.94%)
PACE 6.86 Decreased By ▼ -0.08 (-1.15%)
PAEL 40.06 Decreased By ▼ -1.36 (-3.28%)
PIAHCLA 16.79 Decreased By ▼ -0.07 (-0.42%)
PIBTL 8.32 Decreased By ▼ -0.14 (-1.65%)
POWER 9.43 Increased By ▲ 0.04 (0.43%)
PPL 182.19 Decreased By ▼ -3.74 (-2.01%)
PRL 41.83 Increased By ▲ 0.56 (1.36%)
PTC 24.56 Decreased By ▼ -0.21 (-0.85%)
SEARL 102.53 Decreased By ▼ -2.12 (-2.03%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.44 Decreased By ▼ -1.47 (-3.59%)
SYM 17.33 Decreased By ▼ -0.72 (-3.99%)
TELE 8.76 Decreased By ▼ -0.15 (-1.68%)
TPLP 12.75 Decreased By ▼ -0.09 (-0.7%)
TRG 65.40 Decreased By ▼ -1.20 (-1.8%)
WAVESAPP 11.11 Decreased By ▼ -0.19 (-1.68%)
WTL 1.70 Decreased By ▼ -0.08 (-4.49%)
YOUW 3.94 Decreased By ▼ -0.06 (-1.5%)
BR100 11,988 Decreased By -121.3 (-1%)
BR30 36,198 Decreased By -400.2 (-1.09%)
KSE100 113,443 Decreased By -1598.8 (-1.39%)
KSE30 35,635 Decreased By -564.3 (-1.56%)

DCO Saeed Wahlah visited the site of under completion building of museum and inspected the construction work of museum. He directed that the building of the museum should be completed within stipulated period and high quality construction work should be ensured for its durability.
He observed that the design and style of construction work should be matched with the adjacent victorial style building of Allama Iqbal Public Library. He said that the future requirements should be kept in view for the establishment of exit and entryways, parking areas and other different sections of the museum.
He also visited adjacent library and said the uplifting work of this library would also be carried out for its renovation and it would be made modern library. He issued necessary directions for the rehabilitation of library. EDO works Chaudhry Muhammad Aslam and DO building Muhammad Nawaz Gazi briefed the DCO regarding the pace of construction work and specification of the layout plan. DOC Liaqat Ali Chattha and others officers were also present on the occasion.

Copyright Business Recorder, 2010

Comments

Comments are closed.