AGL 40.01 Decreased By ▼ -0.20 (-0.5%)
AIRLINK 127.00 Decreased By ▼ -0.64 (-0.5%)
BOP 6.69 Increased By ▲ 0.02 (0.3%)
CNERGY 4.51 Increased By ▲ 0.06 (1.35%)
DCL 8.64 Decreased By ▼ -0.09 (-1.03%)
DFML 41.04 Decreased By ▼ -0.12 (-0.29%)
DGKC 85.61 Decreased By ▼ -0.50 (-0.58%)
FCCL 33.11 Increased By ▲ 0.55 (1.69%)
FFBL 66.10 Increased By ▲ 1.72 (2.67%)
FFL 11.55 Decreased By ▼ -0.06 (-0.52%)
HUBC 111.11 Decreased By ▼ -1.35 (-1.2%)
HUMNL 14.82 Increased By ▲ 0.01 (0.07%)
KEL 5.17 Increased By ▲ 0.13 (2.58%)
KOSM 7.66 Increased By ▲ 0.30 (4.08%)
MLCF 40.21 Decreased By ▼ -0.12 (-0.3%)
NBP 60.51 Decreased By ▼ -0.57 (-0.93%)
OGDC 194.10 Decreased By ▼ -0.08 (-0.04%)
PAEL 26.72 Decreased By ▼ -0.19 (-0.71%)
PIBTL 7.37 Increased By ▲ 0.09 (1.24%)
PPL 153.79 Increased By ▲ 1.11 (0.73%)
PRL 26.21 Decreased By ▼ -0.01 (-0.04%)
PTC 17.18 Increased By ▲ 1.04 (6.44%)
SEARL 85.60 Decreased By ▼ -0.10 (-0.12%)
TELE 7.57 Decreased By ▼ -0.10 (-1.3%)
TOMCL 34.39 Decreased By ▼ -2.08 (-5.7%)
TPLP 8.82 Increased By ▲ 0.03 (0.34%)
TREET 16.82 Decreased By ▼ -0.02 (-0.12%)
TRG 62.55 Decreased By ▼ -0.19 (-0.3%)
UNITY 27.29 Decreased By ▼ -0.91 (-3.23%)
WTL 1.30 Decreased By ▼ -0.04 (-2.99%)
BR100 10,112 Increased By 26 (0.26%)
BR30 31,188 Increased By 17.5 (0.06%)
KSE100 94,996 Increased By 232 (0.24%)
KSE30 29,481 Increased By 71 (0.24%)

Jordan and South Korea on Tuesday signed an agreement for the construction of a research-purpose nuclear reactor costing 130 million dollars, a government statement said. The agreement was concluded between the Jordan Atomic Energy Commission (JAEC) and a South Korean consortium comprising the Korean Atomic Energy Research Institute (KAERI) and the Daewoo Engineering and Construction group.
The signing ceremony was attended by Prime Minister Samir Rifai and the visiting South Korean Minister of Education, Science and Technology Ahn Myong-man. In addition to the construction of a 5-megawatt reactor, the accord provides for the setting up of a nuclear educational and training centre at JUST, the JAEC's chairman Khalid Touqan said.
Touqan said that the reactor, the capacity of which is to be upgraded to 10 megawatts at a later stage, would be fully commissioned within five years and would pave the way for building a nuclear power plant by 2017. The project will be financed by 60 million dollars from the JAEC and 70 million dollars from a soft loan extended to Jordan by the South Korean government, he said.

Copyright Deutsche Presse-Agentur, 2010

Comments

Comments are closed.