AIRLINK 196.38 Increased By ▲ 4.54 (2.37%)
BOP 10.11 Increased By ▲ 0.24 (2.43%)
CNERGY 7.75 Increased By ▲ 0.08 (1.04%)
FCCL 38.10 Increased By ▲ 0.24 (0.63%)
FFL 15.74 Decreased By ▼ -0.02 (-0.13%)
FLYNG 24.54 Decreased By ▼ -0.77 (-3.04%)
HUBC 130.38 Increased By ▲ 0.21 (0.16%)
HUMNL 13.73 Increased By ▲ 0.14 (1.03%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 6.19 Decreased By ▼ -0.02 (-0.32%)
MLCF 44.85 Increased By ▲ 0.56 (1.26%)
OGDC 206.51 Decreased By ▼ -0.36 (-0.17%)
PACE 6.58 Increased By ▲ 0.02 (0.3%)
PAEL 39.77 Decreased By ▼ -0.78 (-1.92%)
PIAHCLA 17.20 Decreased By ▼ -0.39 (-2.22%)
PIBTL 7.99 Decreased By ▼ -0.08 (-0.99%)
POWER 9.20 Decreased By ▼ -0.04 (-0.43%)
PPL 178.91 Increased By ▲ 0.35 (0.2%)
PRL 38.93 Decreased By ▼ -0.15 (-0.38%)
PTC 24.31 Increased By ▲ 0.17 (0.7%)
SEARL 109.27 Increased By ▲ 1.42 (1.32%)
SILK 1.00 Increased By ▲ 0.03 (3.09%)
SSGC 37.75 Decreased By ▼ -1.36 (-3.48%)
SYM 18.83 Decreased By ▼ -0.29 (-1.52%)
TELE 8.53 Decreased By ▼ -0.07 (-0.81%)
TPLP 12.14 Decreased By ▼ -0.23 (-1.86%)
TRG 64.76 Decreased By ▼ -1.25 (-1.89%)
WAVESAPP 12.11 Decreased By ▼ -0.67 (-5.24%)
WTL 1.64 Decreased By ▼ -0.06 (-3.53%)
YOUW 3.87 Decreased By ▼ -0.08 (-2.03%)
BR100 12,000 Increased By 69.2 (0.58%)
BR30 35,548 Decreased By -112 (-0.31%)
KSE100 114,256 Increased By 1049.3 (0.93%)
KSE30 35,870 Increased By 304.3 (0.86%)

LAHORE: Pakistan Water and Power Development Authority (WAPDA) Chairman Lt Gen (R) Muzammil Hussain on Wednesday visited Mangla Watershed Management Project to review progress on various measures being taken under the project.

Mangla Dam Raising Project Director and Mangla Watershed Management Project Director were also present, according to WAPDA spokesman here.

The Chairman said that watershed management played a pivotal role to increase life of water reservoirs by controlling soil erosion and reducing sediment rate flowing to the reservoir.

Therefore, implementation of the measures under watershed management was also important like that of constructing dams for water storage. He directed the officials concerned to remain focused on achieving the targets, which have been set for them.

The Chairman was briefed that WAPDA had been implementing Mangla Watershed Management Programme since 1960 in reservoir's catchment area, covering 5710 square miles in Azad Jammu and Kashmir (AJK) and Pakistan to control soil erosion and reduce sediment rate.

Some of the measures taken under the project from 1966 to 2017 include raising of about 130 million plants in its nurseries, afforestation on 166,653 acre catchment area of Mangla reservoir, and construction of 3746 engineering structures in addition to constructing numerous soil conservation structures.

It is pertinent to mention that the consultants of Mangla Dam in their design of the project way back in 1960, had envisaged life of the Mangla reservoir from 100 to 115 years with an estimated sediment load at the rate of 42,000 acre feet per annum. However, due to effective measures taken under the Watershed Management Project, the assessed rate of sediment load has reduced to 27,747 acre feet annually.

Effective watershed techniques and completion of Mangla Dam Raising Project have increased the life of Mangla reservoir from 115 to 269 years.

The volume of benefits because of the Mangla's enhanced life could be better assessed with the fact that the benefits equivalent to billion of rupees are accrued every year from Mangla Dam.

 

Copyright APP (Associated Press of Pakistan), 2017
 

Comments

Comments are closed.