AIRLINK 182.98 Decreased By ▼ -2.21 (-1.19%)
BOP 9.65 Decreased By ▼ -0.28 (-2.82%)
CNERGY 7.26 Decreased By ▼ -0.03 (-0.41%)
FCCL 36.70 Increased By ▲ 0.06 (0.16%)
FFL 14.33 Decreased By ▼ -0.20 (-1.38%)
FLYNG 24.85 Decreased By ▼ -0.07 (-0.28%)
HUBC 126.05 Decreased By ▼ -0.78 (-0.61%)
HUMNL 12.91 Decreased By ▼ -0.16 (-1.22%)
KEL 4.32 No Change ▼ 0.00 (0%)
KOSM 6.05 Decreased By ▼ -0.01 (-0.17%)
MLCF 42.70 Decreased By ▼ -0.19 (-0.44%)
OGDC 196.69 Increased By ▲ 1.25 (0.64%)
PACE 6.25 Decreased By ▼ -0.04 (-0.64%)
PAEL 38.15 Increased By ▲ 0.19 (0.5%)
PIAHCLA 16.90 No Change ▼ 0.00 (0%)
PIBTL 7.73 Decreased By ▼ -0.06 (-0.77%)
POWER 9.26 Decreased By ▼ -0.13 (-1.38%)
PPL 168.03 Increased By ▲ 0.14 (0.08%)
PRL 33.32 Decreased By ▼ -0.70 (-2.06%)
PTC 22.30 Decreased By ▼ -0.21 (-0.93%)
SEARL 102.24 Decreased By ▼ -1.73 (-1.66%)
SILK 1.09 Decreased By ▼ -0.10 (-8.4%)
SSGC 35.63 Decreased By ▼ -0.32 (-0.89%)
SYM 17.97 Decreased By ▼ -0.13 (-0.72%)
TELE 7.99 Decreased By ▼ -0.03 (-0.37%)
TPLP 11.62 Decreased By ▼ -0.01 (-0.09%)
TRG 66.41 Increased By ▲ 0.25 (0.38%)
WAVESAPP 12.00 Decreased By ▼ -0.13 (-1.07%)
WTL 1.54 Increased By ▲ 0.02 (1.32%)
YOUW 3.78 Decreased By ▼ -0.03 (-0.79%)
BR100 11,529 Decreased By -40 (-0.35%)
BR30 33,934 Decreased By -99.6 (-0.29%)
KSE100 110,132 Decreased By -169.3 (-0.15%)
KSE30 34,336 Decreased By -50.6 (-0.15%)

"I can't repeat the past mistake of giving deadline for ending power loadshedding, however I would try my best to minimise the power loadshedding, "There will be less loadshedding during the coming summer as compares to the last year," 2,000 MW of electricity would be added in the system soon, said Water and Power Minister Syed Naveed Qamar while talking to newsmen here on Sunday.
To a question, he said the Kalabgh dam project has become a complicated issue. All the hydropower projects will be constructed with consensus among the provinces. The minister, however, revealed that 'speedy work' has been initiated on various power projects, with some of them to be completed 'very soon.'
To a question, he said that he was not able to give any date for ending the loadshedding. To another question about the on-going gas loadshedding crisis, the federal minister said the things would improve with the improvement of weather. Naveed said that the shares of the OGDCL and power sector would be floated in different phases in next three years. Naveed Qamar said that effective and far-reaching measures would be taken to combat the floods and to minimise the ravages of floods in future. He said that creation of an effective and efficient flood management system was not a simple recipe, rather it involves a large number of controllable and uncontrollable parameters, chiefly depending on topography of the area. Pakistan has great variations in its topography, which accordingly, possess greater challenge to flood managers involving both structural as well as non-structural measures.
There was a need of reviewing flood forecasting and early warning system, which includes identification of additional locations for the installation of additional weather radars, he said.

Copyright Business Recorder, 2011

Comments

Comments are closed.